Brooklyn Lodge Broad Bush Blunsdon Swindon SN26 7DH Data via plota.co.uk

S/26/1374 - Full Planning Application Application Pending Decision

Proposal

Erection of 1 no. new dwelling. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
✓
Consultation
10 Nov 2026
Decision
Expected by 31 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 31 Dec 2026 and 7 Jan 2027, from Swindon's recent new homes.

Comments are open until 1 Dec 2026

Comment on this application ↗

Site constraints 3

Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Broad Blunsdon built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 10 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area272 m² (2,928 sq ft)
Energy ratingC (80 out of 100), could reach B
PropertyDetached house, 7 habitable rooms
Built2012 to 2021
HeatingBoiler and underfloor heating, mains gas, Boiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in November 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Swindon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swindon
Application type
Full Planning Application
Postcode
SN26 7DH
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Blunsdon
Parish
Blunsdon Parish Council
Case officer
Show
Target decision
31 Dec 2026
Applicant
Show
Agent
LPC (Trull) Ltd

Decision outlook

Day 13 of the 56-day target. Swindon usually decides new homes by day 56.

Day 1343 days to the 56-day target
56%decided within 8 weeks
80%approved
13%go to committee

Plota live figures for new homes decided by Swindon in the last twelve months, from validation. Swindon decision record →

Public comments

No public comments yet.

7 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15345421
Planning Portal ref
PP-15345421
Neighbours
10 Nov 2026
Consultation
10 Nov 2026
Comments by
1 Dec 2026
Statutory expiry
31 Dec 2026
Env. assessment
No
Swindon
Planning Authority Score
7.7/10
Good
#37 of 296 councils
Relevant to this application:
Householder decisions

Swindon is one of the fastest councils in England for householder decisions, ranking #12 out of 296. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Swindon decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #119 of 296
91%
Householder approved
Above avg (90%) #182 of 296
92%
Decided in 8 weeks
Above avg (63%) #12 of 296
15%
Extended time limit
Below avg (41%) #12 of 296
76%
Minor dwellings approved
70 decided (1-9 homes)
81%
Major dwellings approved
26 decided (10+ homes)
84%
Change of use approved
83 decided
866
Total decisions
89 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.