Pavement O/s, 76 Stamford Hill, London, N16 6XS Data via plota.co.uk

2026/1365 - Full Planning Permission Approved

Proposal

Proposed New Communications Kiosk with integrated advertising display and defibrillator, with associated Telephone kiosk removal. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jun 2026
✓
Approved
16 Sept 2026

Approved on 16 Sept 2026 · Delegated · Last checked 30 Sept 2026

Documents 24

All documents on the council site ↗

Site constraints 10

3 Article 4 directions
Stoke Newington High Street District Town Centre · Stoke Newington District Centre · Whole of the London Borough of Hackney. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Stoke Newington
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Local nature reserve 233 m away: Abney Park Cemetery
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
1 listed building within 150 m; Registered park or garden 233 m away: Abney Park Cemetery; Inside the Hackney built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
N16 6XS
Received
22 Jun 2026
Validated
22 Jun 2026
Ward
Cazenove Ward
Case officer
Show
Target decision
18 Sept 2026
Decision
Grant
Decision date
16 Sept 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 86 days from validation, 15 days slower than Hackney's median of 71 for signs and adverts. Approved, as 73% of signs and adverts here are.

38%decided within 8 weeks
73%approved
151decided in the last year

Plota live figures for signs and adverts decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
18 Sept 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026