unit 3-5, Curzon Building 306-310 Ormeau Road, Ormeau, Belfast, BT7 2GE Data via plota.co.uk
Description
Discharge of Condition 3 - Foul Drainage. Data via plota.co.uk
Last checked
Associated applications 3
Part of
Conditions 3 decided (outcome not recorded)
- ConditionsDischarge of Condition 3 - Foul Drainage.This applicationLA04/2025/0756/DC
Every application in Belfast - and every UK council - as a live feed, an API, or a bulk CSV export.
Other new applications on this street
Former Good Shepherd Centre at lands at Nos. 511 and 511a Ormeau Road Belfast BT7 3GS
Final Archaeological Report to Discharge of Condition 5 of LA04/2026/0021/F
36 Ormeau Road, Ormeau, Belfast, BT7 2EA
Proposed redevelopment of existing building (part demolition) to include 13 apar...
Rosario Youth Club 469 Ormeau Road, Ormeau, Belfast, BT7 3GR
Proposed alterations to Rosario Youth Centre to include a new first floor extens...
429 Ormeau Road, Belfast, BT7 3GQ
1No. illuminated fasica sign, 1No. projecting sign and 3No. window vinyl
Nearby new applications
Former Good Shepherd Centre at lands at Nos. 511 and 511a Ormeau Road Belfast BT7 3GS
Final Archaeological Report to Discharge of Condition 5 of LA04/2026/0021/F
22 Ravenhill Park, Belfast, BT6 0DE
Two storey rear & side extension, rear dormer and roof lights to front. New wind...
1 Burmah Street, Ballynafoy, Belfast, BT7 3AN
Single-storey rear extension
Rosario Youth Club 469 Ormeau Road, Ormeau, Belfast, BT7 3GR
Proposed alterations to Rosario Youth Centre to include a new first floor extens...
22 Whitehall Gardens, Belfast, BT7 3GW
Proposed change of use from existing dwelling to short term let with retention o...
429 Ormeau Road, Belfast, BT7 3GQ
1No. illuminated fasica sign, 1No. projecting sign and 3No. window vinyl
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Referenced application
Council archive
Unit 3-5 Curzon Building, 306-310 Ormeau Road, Belfast, BT7 2GE
Change of use from bank to restaurant and sub-division of premises into 3 restaurant units and associated new shopfronts.
- Received
- 21 Apr 2023
- Decided
- 10 Apr 2024
- Outcome
- Approved