proposed Golden Hill to Broadfield 33kV Overhead Line Data via plota.co.uk

26/501/OHL - OHL Consultations Sent

Proposal

Application for consent under Section 37 of the Electricity Act 1989 for the installation of a 33kV Overhead Line Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Dec 2026, from Pembrokeshire's recent utility and infrastructure works.

Site constraints 20

Tree preservation orderTAN15 - Zone C2Catchment Pembroke SchoolBat Priority SpeciesCatchment Golden Grove CPCatchment -Cosheston VCHSE_Major_Hazard_ National GridListed buildingScheduled Ancient Monuments Buffer 500PredictiveALC- 4FMfPSeas Flood Zone 3FMfP River Flood Zone 2Surface water flood riskGrade IPolicy GN.22 Sand Gravel ResourcePolicy GN.39 Transport Routes and ImprovementsPolicy GN.22 Hard Rock ResourcesPolicy SP.9 Welsh Language
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Tree preservation orderCouncil record
Recorded by the council for this site.
Council site ↗
TAN15 - Zone C2Council record
Recorded by the council for this site.
Council site ↗
Catchment Pembroke SchoolCouncil record
Recorded by the council for this site.
Council site ↗
Bat Priority SpeciesCouncil record
Recorded by the council for this site.
Council site ↗
Catchment Golden Grove CPCouncil record
Recorded by the council for this site.
Council site ↗
Catchment -Cosheston VCCouncil record
Recorded by the council for this site.
Council site ↗
HSE_Major_Hazard_ National GridCouncil record
Recorded by the council for this site.
Council site ↗
Listed buildingCouncil record
Recorded by the council for this site.
Council site ↗
Scheduled Ancient Monuments Buffer 500Council record
Recorded by the council for this site.
Council site ↗
PredictiveALC- 4Council record
Recorded by the council for this site.
Council site ↗
FMfPSeas Flood Zone 3Council record
Recorded by the council for this site.
Council site ↗
FMfP River Flood Zone 2Council record
Recorded by the council for this site.
Council site ↗
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Grade ICouncil record
Recorded by the council for this site.
Council site ↗
Policy GN.22 Sand Gravel ResourceCouncil record
Recorded by the council for this site.
Council site ↗
Policy GN.39 Transport Routes and ImprovementsCouncil record
Recorded by the council for this site.
Council site ↗
Policy GN.22 Hard Rock ResourcesCouncil record
Recorded by the council for this site.
Council site ↗
Policy SP.9 Welsh LanguageCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
National infrastructure project 1.8 km away: Gwynt Glas Offshore Wind Farm, at pre-application.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Pembrokeshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
OHL
Received
20 Oct 2026
Validated
20 Oct 2026
Ward
Lamphey, Pembroke St Michael, Pembroke St Mary North
Case officer
Show
Target decision
14 Dec 2026
Decision level
Decision to be made by officer
Applicant
Show

Decision outlook

Day 34 of the 56-day target. Pembrokeshire usually decides utility and infrastructure works by day 55.

Day 3422 days to the 56-day target
70%decided within 8 weeks
93%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by Pembrokeshire in the last twelve months, from validation. Pembrokeshire decision record →

Consultation & key dates

Statutory expiry
24 Nov 2026