Montrose 55 Hart Hill Lane Luton LU2 0BA Data via plota.co.uk

26/00820/OUT - Outline Application Awaiting decision

Proposal

Erection of a two storey detached building to create four two bedroom flats. Details of access, appearance, layout and scale. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Aug 2026
✓
Validated
15 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Nov 2026, from Luton's recent new homes.

Site constraints 3

National infrastructure project 472 m away: London Luton Airport Expansion
The site is 472 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Luton built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area112 m² (1,206 sq ft)
Energy ratingD (66 out of 100), could reach C
PropertyDetached house, 5 habitable rooms
Built1976 to 1982
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in April 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Luton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Luton
Application type
Outline Application
Postcode
LU2 0BA
Received
4 Aug 2026
Validated
15 Sept 2026
Ward
ROUND GREEN
Target decision
10 Nov 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 24 of the 56-day target. Luton usually decides new homes by day 56.

Day 2432 days to the 56-day target
66%decided within 8 weeks
62%approved
97decided in the last year

Plota live figures for new homes decided by Luton in the last twelve months, from validation. Luton decision record →

Public comments

No public comments yet.

Last counted 30 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Luton
Planning Authority Score
3.2/10
Poor
#229 of 296 councils
Relevant to this application:
Major dwellings

Luton ranks #187 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Luton decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #281 of 296
86%
Householder approved
Below avg (90%) #245 of 296
60%
Decided in 8 weeks
Below avg (63%) #187 of 296
43%
Extended time limit
Above avg (41%) #171 of 296
35%
Minor dwellings approved
71 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
40%
Change of use approved
53 decided
741
Total decisions
179 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.