Newsagents, 6A Bank Buildings, Station Road, Hastings, TN34 1NG Data via plota.co.uk

HS/FA/26/00356 - Full Planning Permission Approved

Proposal

Installation of an air source heat pump unit to the rear elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Jun 2026
✓
Consultation
22 Sept 2026
✓
Approved
21 Oct 2026

Approved on 21 Oct 2026 · PLANNING COMMITTEE · Last checked 22 Oct 2026

Documents 20

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Hastings Town Centre conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Hastings Town Centre
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Special protection area 216 m away: Dungeness, Romney Marsh and Rye Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
17 listed buildings within 150 m
Nearest: Number 1, Bank Buildings, Grade II, 31 m away · 1 Grade II*, 16 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 17 with distances
Historic England ↗
Also on the record
Scheduled monument 246 m away: Hastings Castle, the Collegiate Church of St Mary and the Ladies' Parlour; Inside the Hastings built-up area.
Not affected
Not green belt

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area47 m² (506 sq ft)
Energy ratingC (asset rating 58)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in January 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hastings - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hastings
Application type
Full Planning Permission
Postcode
TN34 1NG
Received
11 Jun 2026
Validated
11 Jun 2026
Ward
CASTLE
Case officer
Show
Target decision
22 Oct 2026
Decision
GRANTED PERMISSION
Decision date
21 Oct 2026
Decision level
PLANNING COMMITTEE
Agent
Meridian Surveyors
Leaseholder
Show

How this decision compares

Decided in 132 days from validation, 73 days slower than Hastings's median of 59 for full applications. Approved, as 78% of full applications here are.

48%decided within 8 weeks
78%approved
10%go to committee

Plota live figures for full applications decided by Hastings in the last twelve months, from validation. Hastings decision record →

Public comments

No public comments yet.

Last counted 22 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
22 Sept 2026
Site or press notice
10 Jul 2026
Committee
21 Oct 2026
Statutory expiry
6 Aug 2026
Hastings
Planning Authority Score
3.8/10
Below average
#206 of 296 councils
Relevant to this application:
Householder decisions

Hastings ranks #139 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Hastings decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #172 of 296
90%
Householder approved
Above avg (90%) #190 of 296
67%
Decided in 8 weeks
Above avg (63%) #139 of 296
50%
Extended time limit
Above avg (41%) #224 of 296
73%
Minor dwellings approved
49 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
76%
Change of use approved
25 decided
338
Total decisions
44 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.