11 Sunnyside KENDAL LA9 7DJ Data via plota.co.uk

2026/1641/HOU - Householder Officer Consideration

Proposal

Installation of an electric vehicle (EV) chargepoint on the front external wall of the dwelling, as part of Westmorland and Furness Council’s EV Pavement Channel Trial Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Aug 2026
✓
Validated
21 Aug 2026
Decision
Expected by 16 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 16 Oct 2026, from Westmorland and Furness's recent utility and infrastructure works.

The consultation period closed on 24 Sept 2026.

Site constraints 8

Kendal conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Special area of conservation about 190 m away: River Kent
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
SSSI about 190 m away: River Kent and Tributaries SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Scheduled monument about 172 m away: Kendal Castle and associated earthworks, and earlier ringwork; Inside the Kendal built-up area; Priority habitat about 19 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £425,000 in August 2025. Terraced house, freehold.

21 August 2025£425,000
1 May 1998£88,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area98 m² (1,055 sq ft)
Energy ratingE (51 out of 100), could reach B
PropertyMid-terrace house, 5 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSandstone or limestone, as built, no insulation (assumed)

From the energy performance certificate lodged in April 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
LA9 7DJ
Received
19 Aug 2026
Validated
21 Aug 2026
Ward
Kendal Nether
Parish
Kendal
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Chris Newman-Day

Decision outlook

Day 49 of the 56-day target. Westmorland and Furness usually decides utility and infrastructure works by day 56.

Day 497 days to the 56-day target
61%decided within 8 weeks
98%approved
48decided in the last year

Plota live figures for utility and infrastructure works decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
25 Aug 2026
Comments by
24 Sept 2026
Site or press notice
28 Aug 2026
Statutory expiry
16 Oct 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.