105191-274 London Road Chatteris Cambridgeshire Data via plota.co.uk

F/YR26/0813/C1490E - Overhead Lines Exemption Pending consideration

Proposal

Removal of a section of high voltage (HV) overhead lines and approximately 8 wooden poles plus four new terminal pole locations, along same alignment of existing apparatus Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Oct 2026
✓
Validated
2 Nov 2026
✓
Consultation
3 Nov 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 26 Dec 2026, from Fenland's recent utility and infrastructure works.

Comments are open until 25 Nov 2026

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 503 m away: Fens Reservoir, at pre-application; Priority habitat about 49 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 17 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fenland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Fenland
Application type
Overhead Lines Exemption
Received
30 Oct 2026
Validated
2 Nov 2026
Ward
Chatteris South
Parish
Chatteris Town Council
Target decision
14 Dec 2026
Agent
Fisher German LLP

Decision outlook

Day 16 of the 56-day target. Fenland usually decides utility and infrastructure works by day 54.

Day 1640 days to the 56-day target
76%decided within 8 weeks
98%approved
47decided in the last year

Plota live figures for utility and infrastructure works decided by Fenland in the last twelve months, from validation. Fenland decision record →

Public comments

No public comments yet.

56 neighbours consulted · Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
3 Nov 2026
Consultation
3 Nov 2026
Comments by
25 Nov 2026
Site or press notice
11 Nov 2026
Statutory expiry
14 Dec 2026
Env. assessment
No
Fenland
Planning Authority Score
6.1/10
Average
#98 of 296 councils
Relevant to this application:
Householder decisions

Fenland is faster than most councils at deciding householder applications, ranking #58 out of 296. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Fenland decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #170 of 296
93%
Householder approved
Above avg (90%) #128 of 296
77%
Decided in 8 weeks
Above avg (63%) #58 of 296
42%
Extended time limit
Above avg (41%) #163 of 296
78%
Minor dwellings approved
194 decided (1-9 homes)
77%
Major dwellings approved
26 decided (10+ homes)
90%
Change of use approved
29 decided
604
Total decisions
79 refused in the year to March 2026