Unit A3 Fleets Corner Business Park Poole BH17 0LA Data via plota.co.uk

P/26/03619/PNPHV - Prior Notification (Part 14.J Application Under Consideration

Proposal

Prior approval for installation of rooftop solar array. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2026
✓
Validated
11 Aug 2026
Decision
Expected by 6 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Oct 2026, from BCP's recent commercial premises.

The consultation period closed on 15 Sept 2026.

Site constraints 4

Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Local nature reserve about 281 m away: Hatch Pond
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Inside the Poole built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Prior Notification (Part 14.J
Postcode
BH17 0LA
Received
30 Jul 2026
Validated
11 Aug 2026
Ward
Canford Heath
Parish
Poole Town Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Cushman & Wakefield

Decision outlook

Day 59, past the statutory target. 80% of commercial premises in BCP are decided within thirteen weeks, which runs to 10 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 1 Oct 2026.

Day 593 days past the 56-day target
54%decided within 8 weeks
83%approved
147decided in the last year

Plota live figures for commercial premises decided by BCP in the last twelve months, from validation. BCP decision record →

Consultation & key dates

Comments by
15 Sept 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Householder decisions

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026