Proposal

Proposed Change of Use of existing Groundsman store into a kiosk selling refreshments and cold food, installing a purpose made kitchen and forming a new opening on the South elevation to function as serving hatch with a security roller shutter. Additional external seating on the existing hard standing and adjacent grassed area. Existing storage container to the south of the building to be removed to allow access to the South elevation. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 May 2026
✓
Validated
11 Jun 2026
✓
Approved
21 Sept 2026

Approved on 21 Sept 2026 · Delegated Decision · Last checked 21 Sept 2026

Planning committee

Decided by Havant Planning Committee on 17 Sept 2026.

Approved

As officers recommended.

  • Officers advised approval because the kiosk would reuse a vacant building without unacceptable effects on neighbours, the area or highways.
  • Residents raised concerns about parking, noise, litter, anti-social behaviour, security and the availability of toilets and bins.
  • The committee granted permission subject to conditions after discussing opening hours, waste collection and effects on neighbours.
Read how the committee decided The proposed kiosk, site context, officer assessment, public concerns, committee discussion, conditions and decision.

Source: Plota analysis of Havant's committee minutes of 17 Sept 2026.

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 374 m away: AQUIND Interconnector
The site is about 374 m from the project boundary. Electricity line, awaiting the Secretary of State's decision.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Waterlooville built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havant
Application type
Change of use
Postcode
PO7 6AW
Received
21 May 2026
Validated
11 Jun 2026
Ward
Waterloo
Case officer
Show
Target decision
6 Aug 2026
Decision
Approve with Conditions
Decision date
21 Sept 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 102 days from validation, 29 days slower than Havant's median of 73 for extensions. Approved, as 96% of extensions here are.

37%decided within 8 weeks
96%approved
257decided in the last year

Plota live figures for extensions decided by Havant in the last twelve months, from validation. Havant decision record →

Public comments

6comments received
4 objecting2 neutral

67% object · below the UK average of 74%

Last counted 21 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Committee
17 Sept 2026
Havant
Planning Authority Score
3/10
Poor
#235 of 296 overall
Relevant to this application:
Change of use

Havant is one of the slowest councils in England for householder decisions: #283 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026