Maple House, 1 To 7 Princes Parade, 8-16 (evens), And 30 - 32 High Street Potters Bar Hertfordshire Data via plota.co.uk

26/1162/S62A - Section 62A application Awaiting decision

Proposal

Partial demolition of existing buildings (with retention of existing two-storey car park and substation) and redevelopment of the site to provide a mixed-use development comprising residential apartments (class C3) and flexible commercial floorspace (class E) across 4 blocks and associated internal roads, parking, drainage, landscaping, amenity space and associated works (PINS reference ). Data via plota.co.uk

View original council record ↗

Application progress

Received
13 Aug 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Documents 162

Statements & assessments 21

PDF Design & access statement Supporting Documents · 13 Aug 2026 View ↗ PDF Foul and surface water statement Supporting Documents · 13 Aug 2026 View ↗ PDF Heritage statement Supporting Documents · 13 Aug 2026 View ↗ PDF Gateway 1 fire statement Supporting Documents · 13 Aug 2026 View ↗ PDF Flood risk assessment & drainage strategy Supporting Documents · 13 Aug 2026 View ↗ PDF Energy statement Supporting Documents · 13 Aug 2026 View ↗ PDF Commercial needs assessment Supporting Documents · 13 Aug 2026 View ↗ PDF Biodiversity metric Supporting Documents · 13 Aug 2026 View ↗ PDF Biodiversity metric Supporting Documents · 13 Aug 2026 View ↗ PDF Bat emergence survey report Supporting Documents · 13 Aug 2026 View ↗ PDF Air quality assessment Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Noise impact assessment Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Overheating assessment Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Transport assessment Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Tree survey Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Sustainability statement Supporting Documents · 13 Aug 2026 View ↗ PDF Preliminary ecological appraisal Supporting Documents · 13 Aug 2026 View ↗ PDF Planning statement Supporting Documents · 13 Aug 2026 View ↗ PDF Pre & post development habitat survey report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 1 Site survey Supporting Documents · 13 Aug 2026 View ↗ PDF Part 2 Site survey Supporting Documents · 13 Aug 2026 View ↗

Plans & drawings 106

PDF 01202-p00 Existing car park elevations Drawing/Plans · 13 Aug 2026 View ↗ PDF 01202-p00 Existing car park elevations Drawing/Plans · 13 Aug 2026 View ↗ PDF 01201-p02 Existing high street Drawing/Plans · 13 Aug 2026 View ↗ PDF 01201-p02 Existing high street Drawing/Plans · 13 Aug 2026 View ↗ PDF 01200-p03 Existing princes parade Drawing/Plans · 13 Aug 2026 View ↗ PDF 01200-p03 Existing princes parade Drawing/Plans · 13 Aug 2026 View ↗ PDF 01002-p03 Existing site plan Drawing/Plans · 13 Aug 2026 View ↗ PDF 01001-p03 Existing site plan Drawing/Plans · 13 Aug 2026 View ↗ PDF 01000-p03 Site location plan Drawing/Plans · 13 Aug 2026 View ↗ PDF 20015-p04 General arrangement-typical roof Drawing/Plans · 13 Aug 2026 View ↗ PDF 20007-p05 General arrangement-typical upper floor Drawing/Plans · 13 Aug 2026 View ↗ PDF 20004-p05 General arrangement-typical lower floor Drawing/Plans · 13 Aug 2026 View ↗ PDF 20000-p08 General arrangement-ground floor Drawing/Plans · 13 Aug 2026 View ↗ PDF 01202-p00 Existing car park elevations Drawing/Plans · 13 Aug 2026 View ↗ PDF 20514-p05 Block e general arrangement level 04 north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20513-p08 Block e general arrangement level 01-03 north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20510-p09 Block e general arrangement level ground floor north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20504-p05 Block e general arrangement level 04 south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20503-p08 Block e general arrangement level 01-03 south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20500-p09 Block e general arrangement level ground floor south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20405-p05 Block d general arrangement level 05 Drawing/Plans · 13 Aug 2026 View ↗ PDF 20404-p08 Block d general arrangement level 01 Drawing/Plans · 13 Aug 2026 View ↗ PDF 20400-p07 Block d general arrangement ground floor lvevel Drawing/Plans · 13 Aug 2026 View ↗ PDF 20215-p05 Block d general arrangement level 05 north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20214-p08 Block d general arrangement level 01-04 north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20210-p07 Block b general arrangement ground floor north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20206-p05 Block b general arrangement level 06 south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20205-p08 Block b general arrangement level 05 south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20204-p08 Block b general arrangement level 01-04 south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20200-p07 Block b general arrangement level ground floorsouth Drawing/Plans · 13 Aug 2026 View ↗ PDF 20115-p05 Block b general arrangement level 15 Drawing/Plans · 13 Aug 2026 View ↗ PDF 20108-p07 Block a general arrangement level 06 Drawing/Plans · 13 Aug 2026 View ↗ PDF 20104-p06 Block a general arrangement level 01-05 Drawing/Plans · 13 Aug 2026 View ↗ PDF 20100-p08 Block a general arrangement ground floor Drawing/Plans · 13 Aug 2026 View ↗ PDF C09149 Level b1existing Drawing/Plans · 13 Aug 2026 View ↗ PDF Part 3 Travel plan Supporting Documents · 13 Aug 2026 View ↗ PDF Refuse management plan Supporting Documents · 13 Aug 2026 View ↗ PDF Pb-afk-xx-xx-sh-a-08000_-_soa_p14 Summary Drawing/Plans · 13 Aug 2026 View ↗ PDF P00 Unregistered land Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-sc-0300 Maintenance schedule Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-sc-0200 Planning schedule Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0900 Furniture plan Supporting Documents · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0700 Tree removal plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0600 Tree strategy plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0500 Soft landscape plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0400 Hard landscape plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0303 Grading plan south Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0302 Grading plan centre Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0301 Grading plan north Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0300 Grading plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0200 Roof plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0103 Landscape plan south Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0102 Landscape plan centre Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0101 Landscape plan north Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0100 General arrangement Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs Drawing issue sheet Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0301 Threshold section Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0300 Threshold section Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0200 Soft landscape details Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0200 Boundary section Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0102 General section Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0101 General section Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0100 Hard landscape details Drawing/Plans · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-gs-0100 General section Drawing/Plans · 13 Aug 2026 View ↗ PDF M09153 Existing east elevation Drawing/Plans · 13 Aug 2026 View ↗ PDF M09152 Existing north elevation Drawing/Plans · 13 Aug 2026 View ↗ PDF M09151 Existing west elevation Drawing/Plans · 13 Aug 2026 View ↗ PDF M09150 Existing south elevation Drawing/Plans · 13 Aug 2026 View ↗ PDF M09149 Existing lower ground level Drawing/Plans · 13 Aug 2026 View ↗ PDF M09148 Existing basement plan Drawing/Plans · 13 Aug 2026 View ↗ PDF M09112 Existing level 12 plan Drawing/Plans · 13 Aug 2026 View ↗ PDF M09104 Existing level 01-11 plan Drawing/Plans · 13 Aug 2026 View ↗ PDF M09100 Existing level 00 plan Drawing/Plans · 13 Aug 2026 View ↗ PDF Letter to pins Drawing/Plans · 13 Aug 2026 View ↗ PDF Drawing register Supporting Documents · 13 Aug 2026 View ↗ PDF 22500-p03 Block e ga section Supporting Documents · 13 Aug 2026 View ↗ PDF 22400-p03 Block d ga section aa Supporting Documents · 13 Aug 2026 View ↗ PDF 22200-p03 Block b ga section aa Supporting Documents · 13 Aug 2026 View ↗ PDF 22100-p03 Block a ga section aa Supporting Documents · 13 Aug 2026 View ↗ PDF 22002-p01 Ga site wide section 03 Supporting Documents · 13 Aug 2026 View ↗ PDF 22001-p01 Ga site wide section 02 Drawing/Plans · 13 Aug 2026 View ↗ PDF 22000-p01 Ga site wide section 01 Drawing/Plans · 13 Aug 2026 View ↗ PDF 21600-p01 Car park ga elevations Drawing/Plans · 13 Aug 2026 View ↗ PDF 21503-p03 Block e ga elevation west Drawing/Plans · 13 Aug 2026 View ↗ PDF 21502-p03 Block e ga elevation south Drawing/Plans · 13 Aug 2026 View ↗ PDF 21501-p03 Block e ga elevation east Drawing/Plans · 13 Aug 2026 View ↗ PDF 21500-p03 Block e ga elevation north Drawing/Plans · 13 Aug 2026 View ↗ PDF 21403-p03 Block d ga elevation west Drawing/Plans · 13 Aug 2026 View ↗ PDF 21402-p04 Block d ga elevation south Drawing/Plans · 13 Aug 2026 View ↗ PDF 21401-p03 Block d ga elevation east Drawing/Plans · 13 Aug 2026 View ↗ PDF 21400-p03 Block d ga elevation north Drawing/Plans · 13 Aug 2026 View ↗ PDF 21203-p04 Block b ga elevation west Drawing/Plans · 13 Aug 2026 View ↗ PDF 21202-p03 Block b ga elevation south Drawing/Plans · 13 Aug 2026 View ↗ PDF 21201-p03 Block b ga elevation east Drawing/Plans · 13 Aug 2026 View ↗ PDF 21200-p03 Block b ga elevation north Drawing/Plans · 13 Aug 2026 View ↗ PDF 21103-p02 Block a ga elevation west Drawing/Plans · 13 Aug 2026 View ↗ PDF 21102-p02 Block a ga elevation south Drawing/Plans · 13 Aug 2026 View ↗ PDF 21101-p02 Block a ga elevation east Drawing/Plans · 13 Aug 2026 View ↗ PDF 21100-p02 Block a ga elevation north Drawing/Plans · 13 Aug 2026 View ↗ PDF 21002-p02 Ga elevation south Drawing/Plans · 13 Aug 2026 View ↗ PDF 21001-p02 Ga elevation east Drawing/Plans · 13 Aug 2026 View ↗ PDF 20700-p02 External plant ga plans & elevations Drawing/Plans · 13 Aug 2026 View ↗ PDF 20603-p01 Car park ga upper level north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20602-p01 Car park ga upper level south Drawing/Plans · 13 Aug 2026 View ↗ PDF 20601-p01 Car park ga lower level north Drawing/Plans · 13 Aug 2026 View ↗ PDF 20600-p01 Car park ga lower level south Drawing/Plans · 13 Aug 2026 View ↗

Other documents 33

PDF Daylight & sunlight report Supporting Documents · 13 Aug 2026 View ↗ PDF Cover letter Supporting Documents · 13 Aug 2026 View ↗ PDF Part 1 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 10 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 11 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 12 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 2 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 4 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 5 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 6 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 7 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 8 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 9 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 1 Viability report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 2 Viability report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Viability report Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Payment_confirmation Supporting Documents · 13 Aug 2026 View ↗ PDF Part 1 Townscape and visual impact appraisal Supporting Documents · 13 Aug 2026 View ↗ PDF Part 2 Townscape and visual impact appraisal Supporting Documents · 13 Aug 2026 View ↗ PDF Part 3 Townscape and visual impact appraisal Supporting Documents · 13 Aug 2026 View ↗ PDF Schedule of application docs Supporting Documents · 13 Aug 2026 View ↗ PDF Schedule of application docs Supporting Documents · 13 Aug 2026 View ↗ PDF Phase 1 desk study Supporting Documents · 13 Aug 2026 View ↗ PDF Phase 1 desk study Supporting Documents · 13 Aug 2026 View ↗ PDF Stage 3 fire strategy Supporting Documents · 13 Aug 2026 View ↗ PDF Unilateral undertaking Supporting Documents · 13 Aug 2026 View ↗ PDF Newspaper extract notice Supporting Documents · 13 Aug 2026 View ↗ PDF Newspaper extract front page Supporting Documents · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-sc-0100 Materials schedule Supporting Documents · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-rp-0100 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-rp-0100 Landscape strategy report Supporting Documents · 13 Aug 2026 View ↗ PDF Mrg-268-pbh-pl-0800 Soil profile Supporting Documents · 13 Aug 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Hertsmere - and every UK council - as a live feed or API. About Plota's data service

Important details

Council
Hertsmere
Application type
Section 62A application
Postcode
EN6 5AE
Received
13 Aug 2026
Validated
13 Aug 2026
Ward
Potters Bar Parkfield
Parish
No Parish
Case officer
Show
Target decision
12 Nov 2026
Applicant
Show
Agent
Barker Parry Town Planning Ltd

Public comments

No public comments yet.

Last counted 20 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Env. assessment
No
Hertsmere
Planning Authority Score
3.3/10
Poor
#225 of 296 councils
Relevant to this application:
Householder decisions

Hertsmere is slower than most councils at deciding householder applications, ranking #243 out of 296. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hertsmere decision performance
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #57 of 296
94%
Householder approved
Above avg (90%) #108 of 296
49%
Decided in 8 weeks
Below avg (63%) #243 of 296
55%
Extended time limit
Above avg (41%) #249 of 296
84%
Minor dwellings approved
102 decided (1-9 homes)
75%
Major dwellings approved
8 decided (10+ homes)
89%
Change of use approved
27 decided
742
Total decisions
55 refused in the year to March 2026