Land South Of School Lane Denmead Hampshire Data via plota.co.uk

26/02033/REM - Approval of Reserved Matters Current

Proposal

Reserved Matters for Phase 1 - the internal access road and associated infrastructure pursuant to Outline Planning Permission Ref. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Oct 2026
Decision
Expected by 26 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 23 Nov 2026 and 30 Nov 2026, from Winchester's recent utility and infrastructure works.

Site constraints 4

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Winchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Winchester
Application type
Approval of Reserved Matters
Received
1 Oct 2026
Validated
1 Oct 2026
Ward
DENMEAD WARD
Parish
Denmead Parish Council
Case officer
Show
Target decision
26 Nov 2026
Applicant
Show
Agent
Tetlow King Planning

Decision outlook

Day 53 of the 56-day target. Winchester usually decides utility and infrastructure works by day 56.

Day 533 days to the 56-day target
59%decided within 8 weeks
90%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by Winchester in the last twelve months, from validation. Winchester decision record →

Consultation & key dates

Alt. reference
PP-15254581
Planning Portal ref
PP-15254581
Statutory expiry
26 Nov 2026
Env. assessment
No
Winchester
Planning Authority Score
4.5/10
Below average
#177 of 296 overall
Relevant to this application:
Major dwellings

Winchester is slower than most councils at deciding householder applications: #213 of 296 on speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (97%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Winchester decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #72 of 296
97%
Householder approved
Above avg (90%) #47 of 296
55%
Decided in 8 weeks
Below avg (63%) #213 of 296
50%
Extended time limit
Above avg (41%) #230 of 296
70%
Minor dwellings approved
63 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
88%
Change of use approved
32 decided
918
Total decisions
60 refused in the year to March 2026