P2025/0326/PRA - Prior Approval (Roof Extensions) Refused

Proposal

Notification of Prior Approval, made under Class AA of Part 20 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), for a two storey extension to the existing building which would create 19no. new dwellings. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Feb 2025
✓
Consultation
13 Feb 2025
✗
Refused
27 Jun 2025
Appeal
Not lodged

Refused on 27 Jun 2025 · Delegated · Last checked 21 Nov 2026

Documents 24

All documents on the council site ↗

Site constraints 7

Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
4 listed buildings within 150 m; Conservation area 59 m away: Duncan Terrace/Colebrooke Row; National infrastructure project 1.7 km away: Thames Tideway Tunnel; Inside the Islington built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Prior Approval (Roof Extensions)
Received
3 Feb 2025
Validated
3 Feb 2025
Case officer
Show
Target decision
31 Mar 2025
Decision
Prior approval required - refused
Decision date
27 Jun 2025
Decision level
Delegated
Applicant
Show
Agent
DARA Planning

How this decision compares

Decided in 144 days from validation, 94 days slower than Islington's median of 50 for prior approvals. Refused, as 23% of prior approvals here are.

85%decided within 8 weeks
77%approved
53decided in the last year

Plota live figures for prior approvals decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-13739484
Comments by
5 Mar 2025
Site or press notice
13 Feb 2025
Statutory expiry
6 Mar 2025
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 overall
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications: #260 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026