Century Wharf Crayford Creek Road Crayford Dartford Kent Data via plota.co.uk

26/02024/FUL - Detailed Planning Application With Case Officer

Proposal

Redevelopment of existing scaffolding yard for storage area to incorporate bays for waste storage, installation of a new weighbridge and construction of lean-to structures, together with associated infrastructure for the installation of dust extraction plant Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
3 Nov 2026
✓
Consultation
11 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Dec 2026, from Bexley's recent commercial and major works.

Comments are open until 2 Dec 2026

Comment on this application ↗

Site constraints 12

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Air quality management area: Bexley AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 366 m away: Riverside Energy Park
The site is 366 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Nature improvement area: Greater Thames Marshes; Inside the Bexley built-up area; Public transport access: PTAL 0 (very poor), TfL 2023, for the 100 m square; Green belt 38 m away: London; Flood defence 42 m away (wall, designed for a 1 in 1000 year flood); Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 4 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area97 m² (1,044 sq ft)
Energy ratingG (asset rating 232)
UseOffices and Workshop Businesses
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in August 2026, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Bexley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bexley
Application type
Detailed Planning Application
Received
2 Nov 2026
Validated
3 Nov 2026
Ward
CRAYFORD
Case officer
Show
Target decision
29 Dec 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 20 of the 56-day target. Bexley usually decides commercial and major works by day 56.

Day 2036 days to the 56-day target
77%decided within 8 weeks
97%approved
32decided in the last year

Plota live figures for commercial and major works decided by Bexley in the last twelve months, from validation. Bexley decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
10 Nov 2026
Consultation
11 Nov 2026
Comments by
2 Dec 2026
Statutory expiry
29 Dec 2026
Env. assessment
No
Bexley
Planning Authority Score
8.9/10
Excellent
#5 of 296 overall
Relevant to this application:
Householder decisions

Bexley is one of the fastest councils in England for householder decisions: #17 of 296 on speed. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bexley decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #106 of 296
95%
Householder approved
Above avg (90%) #69 of 296
89%
Decided in 8 weeks
Above avg (63%) #17 of 296
20%
Extended time limit
Below avg (41%) #17 of 296
69%
Minor dwellings approved
124 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
58%
Change of use approved
90 decided
1,324
Total decisions
133 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.