Land to the North of School Road and East of Midgeland Road, Blackpool, FY4 5EW (Easting 333774, Northing 432063) Data via plota.co.uk

26/0298 - Full Planning Application Pending Consideration

Proposal

Use of land as a residential traveller site with four pitches, each with one static caravan, one touring caravan, one ancillary greenhouse structure, associated amenity space, car parking and shared access off School Road. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jun 2026
✓
Validated
27 Jul 2026
✓
Consultation
29 Jul 2026
Decision
Target date was 21 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 119.

The consultation period closed on 1 Sept 2026.

Documents 27

All documents on the council site ↗

Site constraints 6

Marton Moss conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Article 4 Direction - C3 to C4 HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project about 954 m away: Morgan and Morecambe Offshore Wind Farms Transmission Assets
The site is about 954 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Blackpool built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Blackpool - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Blackpool
Application type
Full Planning Application
Postcode
FY4 5EW
Received
1 Jun 2026
Validated
27 Jul 2026
Ward
Stanley
Case officer
Show
Target decision
21 Sept 2026
Decision level
Development Control Committee
Applicant
Show
Agent
Neil Pike Architects

Decision outlook

Day 119, past the statutory target. 80% of changes of use in Blackpool are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 11963 days past the 56-day target
54%decided within 8 weeks
78%approved
12%go to committee

Plota live figures for changes of use decided by Blackpool in the last twelve months, from validation. Blackpool decision record →

Public comments

1comment received
1 objecting

13 neighbours consulted · Last counted 29 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14971055
Planning Portal ref
PP-14971055
Neighbours
7 Aug 2026
Consultation
29 Jul 2026
Comments by
1 Sept 2026
Site or press notice
6 Aug 2026
Statutory expiry
21 Sept 2026
Env. assessment
No
Blackpool
Planning Authority Score
3.8/10
Below average
#204 of 296 overall
Relevant to this application:
Householder decisions

Blackpool is #101 of 296 councils on householder decision speed. Blackpool is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Blackpool decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #232 of 296
78%
Householder approved
Below avg (90%) #285 of 296
72%
Decided in 8 weeks
Above avg (63%) #101 of 296
43%
Extended time limit
Above avg (41%) #169 of 296
58%
Minor dwellings approved
19 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
83%
Change of use approved
41 decided
351
Total decisions
60 refused in the year to March 2026