1 Yeoman Street, London, SE8 5DP Data via plota.co.uk

Decided DC/25/139227
Date received
27 Feb 2025
Date validated
17 Apr 2025
Postcode
SE8 5DP

Description

Removal of combustible materials on the external walls and attachments to the building including ... Data via plota.co.uk

Last checked

Site constraints 11

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Small HMO Northern Extension. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 273 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Lewisham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve about 309 m away: Russia Dock Woodland
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Wider setting of protected view 5A.2 Greenwich Park Wolfe statue to St Paul's Cathedral; 5A.2 Greenwich Park Wolfe statue to Tower Bridge; Radon affected area, class 2; 1 listed building within 150 m of the postcode pin; Inside the Lewisham built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lewisham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Lewisham
Planning Authority Score
5.8/10
Average
#111 of 296 overall
Relevant to this application:
Householder decisions

Lewisham is #127 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Lewisham decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #224 of 296
90%
Householder approved
Above avg (90%) #192 of 296
69%
Decided in 8 weeks
Above avg (63%) #127 of 296
31%
Extended time limit
Below avg (41%) #58 of 296
65%
Minor dwellings approved
117 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
57%
Change of use approved
67 decided
1,303
Total decisions
207 refused in the year to March 2026