Lake House Training Centre, Swithland Water Treatment Plant, Kinchley Lane, Quorn, Leicestershire, LE7 7SB Data via plota.co.uk

P/26/1228/2 - Listed Building Consent Approved

Proposal

Scheme of internal restoration and alteration to include the removal and reinstatement of plaster walls and ceilings, installation of insulation, replacement of flooring restoration and repair or reinstatement of historic architectural features, and removal and reinstatement/alteration of M&E services. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jul 2026
✓
Approved
13 Aug 2026

Approved on 13 Aug 2026 · Last checked 3 Nov 2026

Documents 32

Plans & drawings 25

PDF The Lime Centre report- condition of internal plasterwork Application plans · 10 Aug 2026 View ↗ PDF Existing Front - South East Elevation - PL-E-001 Elevation plan · 2 Jul 2026 View ↗ PDF Existing Rear - North West Elevation - PL-E-002 Elevation plan · 2 Jul 2026 View ↗ PDF Existing Right side - North East Elevation - PL-E-003 Elevation plan · 2 Jul 2026 View ↗ PDF Existing Left side - South West Elevation - PL-E-004 Elevation plan · 2 Jul 2026 View ↗ PDF Proposed Front - South East Elevation - PL-E-011 Elevation plan · 2 Jul 2026 View ↗ PDF Proposed Rear - North West Elevation - PL-E-012 Elevation plan · 2 Jul 2026 View ↗ PDF Proposed Right side - North East Elevation - PL-E-013 Elevation plan · 2 Jul 2026 View ↗ PDF Proposed Left side - South West Elevation - PL-E-014 Elevation plan · 2 Jul 2026 View ↗ PDF Existing Ground Floor Plan - PL-P-000 Floor plan · 2 Jul 2026 View ↗ PDF Existing First Floor Plan - PL-P-001 Floor plan · 2 Jul 2026 View ↗ PDF Existing Roof Plan - PL-P-009 Roof plan · 2 Jul 2026 View ↗ PDF PL-P-010 - Proposed Ground Floor Plan - PL-P-010 Floor plan · 2 Jul 2026 View ↗ PDF Proposed First Floor Plan - PL-P-011 Floor plan · 2 Jul 2026 View ↗ PDF Proposed Roof Plan - PL-P-019 Roof plan · 2 Jul 2026 View ↗ PDF Proposed Ground Floor Plan - Reinstatement - PL-P-100 Floor plan · 2 Jul 2026 View ↗ PDF Proposed First Floor Plan - Reinstatement - PL-P-101 Floor plan · 2 Jul 2026 View ↗ PDF PL-P-130 - Proposed Ground Floor Plan - Insulation Location - PL-P-130 Floor plan · 2 Jul 2026 View ↗ PDF Existing First Floor Plan - Insulation Location - PL-P-131 Floor plan · 2 Jul 2026 View ↗ PDF Existing Section AA - PL-S-001 Section plan · 2 Jul 2026 View ↗ PDF Proposed Section AA - PL-S-011 Section plan · 2 Jul 2026 View ↗ PDF Existing Location Plan - PL-SL-001 Site location plan · 2 Jul 2026 View ↗ PDF Existing Site Plan - PL-SP-001 Block plan · 2 Jul 2026 View ↗ PDF Proposed Site Plan - PL-SP-011 Block plan · 2 Jul 2026 View ↗ PDF STEICO, Internal Wall Insulation IWI Section-1 Supporting information · 2 Jul 2026 View ↗

All documents on the council site ↗

Site constraints 6

Grade II listed: House at Swithland Reservoir Water Works
List entry 1188205 · 6 m away · 4 more listed buildings within 150 m (4 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
SSSI 77 m away: Buddon Wood and Swithland Reservoir SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Priority habitat 5 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Charnwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Charnwood
Application type
Listed Building Consent
Postcode
LE7 7SB
Received
2 Jul 2026
Validated
2 Jul 2026
Ward
Quorn and Mountsorrel Castle
Parish
Quorn
Case officer
Show
Decision
Grant Conditionally
Decision date
13 Aug 2026
Applicant
Show
Freehold owner
Show

How this decision compares

Decided in 42 days from validation, 11 days faster than Charnwood's median of 53 for extensions. Approved, as 94% of extensions here are.

83%decided within 8 weeks
94%approved
516decided in the last year

Plota live figures for extensions decided by Charnwood in the last twelve months, from validation. Charnwood decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
12 Aug 2026
Statutory expiry
27 Aug 2026
Charnwood
Planning Authority Score
5.2/10
Average
#136 of 296 overall
Relevant to this application:
Other decisions

Charnwood is #102 of 296 councils on householder decision speed. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Charnwood decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #166 of 296
88%
Householder approved
Below avg (90%) #216 of 296
72%
Decided in 8 weeks
Above avg (63%) #102 of 296
36%
Extended time limit
Below avg (41%) #108 of 296
73%
Minor dwellings approved
85 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
84%
Change of use approved
62 decided
872
Total decisions
110 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.