Westside House, Stokesley Road, Middlesbrough, TS7 8BG Data via plota.co.uk

26/0400/TCA - Tree Works in Conservation Area Registered

Proposal

Crown clean and reduction works to 1no. Pine, height reduction of 1no. Holly, crown lift to 10no. Lime trees, height reduction to 2no. Leyland Cypress, and removal of 2no. Scots Pine Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
10 Sept 2026
Decision
Expected by 21 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 5 Oct 2026 and 17 Oct 2026, from Middlesbrough's recent tree works.

Site constraints 7

Flood zone 3Flood zone 2Flood Alert Areas buffer = Middlesbrough Becks
Grade II listed: Westside House
List entry 1139834 · 12 m from the pin · 8 more listed buildings within 150 m (1 Grade II*, 7 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 8 with distances
Historic England ↗
Nutrient neutrality catchment: Teesmouth and Cleveland Coast SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Marton Village and The Grove conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Flood zone 3Council record
The council's own flood layer for this site.
Council site ↗
Flood zone 2Council record
The council's own flood layer for this site.
Council site ↗
Flood Alert Areas buffer = Middlesbrough BecksCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Middlesbrough built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 13 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Middlesbrough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works in Conservation Area
Postcode
TS7 8BG
Received
10 Sept 2026
Validated
10 Sept 2026
Ward
Ladgate, Marton East
Case officer
Show
Target decision
21 Oct 2026
Applicant
Show
Agent
M C Tree and Land Services

Decision outlook

Day 5 of the 56-day target. Middlesbrough usually decides tree works by day 30.

Day 551 days to the 56-day target
89%decided within 8 weeks
100%approved
19decided in the last year

Plota live figures for tree works decided by Middlesbrough in the last twelve months, from validation. Middlesbrough decision record →

Consultation & key dates

Alt. reference
PP-15182926
Middlesbrough
Planning Authority Score
1.1/10
Poor
#289 of 296 councils
Relevant to this application:
Other decisions

Middlesbrough is one of the slowest councils in England for householder decisions, ranking #270 out of 296. 55% of applications have the time limit extended, above the 41% national average. Middlesbrough is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Middlesbrough decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #289 of 296
81%
Householder approved
Below avg (90%) #274 of 296
38%
Decided in 8 weeks
Below avg (63%) #270 of 296
55%
Extended time limit
Above avg (41%) #251 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
40%
Major dwellings approved
5 decided (10+ homes)
56%
Change of use approved
36 decided
301
Total decisions
75 refused in the year to March 2026