6 Palgrave Avenue Southall UB1 2LX Data via plota.co.uk
Proposal
Part two, part single storey rear extension; alteration of roof from hip to gable end; rear roof extension; installation of two front rooflights; front porch extension Data via plota.co.uk
Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since late August on its register. Plota adds each one as soon as the council publishes it.
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 11 Nov 2026; it is now day 149.
Documents 5
Plans & drawings 2
Application forms 1
Consultation & comments 1
Other documents 1
Site constraints 5
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Building
From the energy performance certificate lodged in January 2025, the latest held for this property. The building may have changed since. View the certificate
Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
12 North Avenue Southall UB1 2RE
Single storey detached garden outbuilding for use as annexe (following demolitio...
110 Lady Margaret Road Southall UB1 2RJ
Single storey detached garden outbuilding (Lawful Development Certificate for a ...
85 Greenford Avenue Southall UB1 2AE
Single storey side/rear wraparound extension
40 Oakwood Avenue Southall UB1 3QD
Alteration of roof from hip to gable end; rear roof extension; and installation ...
7 Melrose Drive Southall UB1 3QA
Formation of vehicular crossover (dropped kerb) and permeable front garden ribbo...
16 Green Drive Southall UB1 3AY
Change of use of single dwellinghouse (Use Class C3) into a 6-Bedroom House in M...
Important details
Decision outlook
Day 149, past the statutory target. 90% of extensions in Ealing are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 8 Nov 2026.
Plota live figures for extensions decided by Ealing in the last twelve months, from validation. Ealing decision record →
Public comments
No public comments yet.
Last counted 8 Nov 2026
Consultation & key dates
- Alt. reference
- PP-15007521
- Planning Portal ref
- PP-15007521
- Consultation
- 23 Jun 2026
- Comments by
- 20 Jul 2026
- Statutory expiry
- 10 Aug 2026
- Env. assessment
- No
Historical activity at this location
29 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).
Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use
Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.
Track this application
6 Palgrave Avenue Southall UB1 2LX
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 20 Jul 2026.