Land At Sk3931 5448 Snelsmoor Lane, Boulton, Derby. Data via plota.co.uk

DMPA/2026/0743 Under Consultation

Proposal

The variation of condition nos. 1 (approved plans), 2 (building details), 3 (bin stores), 5 (boundary treatments), 7 (hard surfacing details), 8 (carriageway construction) and 10 (drainage of private drives) and removal of condition 12 (swept path analysis) of permission ref. (relating to change to approved drainage proposals) for Approval of reserved matters of outline permission ref. for the erection of 356 dwellings along with associated infrastructure, access roads, drainage and public open space (Boulton Moor Phase 1E) on Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Jun 2026
✓
Validated
6 Jun 2026
Decision
Target date was 23 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 14 Sept 2026; it is now day 170.

The consultation period closed on 14 Sept 2026.

Associated applications 2

  • Part of

    Reserved matterscouncil archive
    • Reserved mattersThe variation of condition nos. 1 (approved plans), 2 (building details), 3 (bin stores), 5…This applicationDMPA/2026/0743

Site constraints 4

Green belt: Derby and Nottingham
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Also on the record
National infrastructure project about 954 m away: Chesterfield to Willington, at pre-application; Inside the Derby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Derbyshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Received
4 Jun 2026
Validated
6 Jun 2026
Case officer
Show
Target decision
23 Sept 2026
Decision level
Delegated Decision

Decision outlook

Day 170, past the statutory target. 76% of new homes in South Derbyshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 170114 days past the 56-day target
49%decided within 8 weeks
68%approved
62decided in the last year

Plota live figures for new homes decided by South Derbyshire in the last twelve months, from validation. South Derbyshire decision record →

Consultation & key dates

Consultation
25 Jun 2026
Comments by
14 Sept 2026
South Derbyshire
Planning Authority Score
6.1/10
Average
#101 of 296 overall
Relevant to this application:
Major dwellings

South Derbyshire is #177 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
South Derbyshire decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #46 of 296
97%
Householder approved
Above avg (90%) #42 of 296
61%
Decided in 8 weeks
Below avg (63%) #177 of 296
38%
Extended time limit
Below avg (41%) #132 of 296
88%
Minor dwellings approved
86 decided (1-9 homes)
89%
Major dwellings approved
19 decided (10+ homes)
97%
Change of use approved
29 decided
605
Total decisions
34 refused in the year to March 2026