Sports Ground Alwyn Gardens Acton W3 0JH Data via plota.co.uk

263258FUL - Full Application Pending Consideration

Proposal

Application for the retention and regularisation of the existing as-built 7-a-side 3G Artificial Grass Pitch, including associated groundworks, drainage, edge restraint, construction of a staff changing room and 3 metre high perimeter fencing at Alwyn Gardens Sports Ground. Existing floodlighting is separately permitted and no alterations to the floodlighting are proposed. (Retrospective) Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
28 Aug 2026
✓
Validated
18 Nov 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 13 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Jan 2027 and 31 Jan 2027, from Ealing's recent commercial and major works.

Comments are open until 15 Dec 2026

Comment on this application ↗

Site constraints 5

Designated open space
Borough-designated open space.
Loss of protected open space is resisted unless it is replaced by space of equal or better quality nearby.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1.6 km away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 21 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W3 0JH
Received
28 Aug 2026
Validated
18 Nov 2026
Ward
North Acton
Target decision
13 Jan 2027
Applicant
Show
Agent
MZA planning

Decision outlook

Day 5 of the 56-day target. Ealing usually decides commercial and major works by day 64.

Day 559 days to the predicted decision (day 64)
43%decided within 8 weeks
90%approved
64decided in the last year

Plota live figures for commercial and major works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15191874
Planning Portal ref
PP-15191874
Consultation
20 Nov 2026
Comments by
15 Dec 2026
Statutory expiry
13 Jan 2027
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026