Plot 6700 Solihull Parkway Marston Green Solihull Data via plota.co.uk

PL/2025/01986/DIS - Discharge of Conditions Approved

Proposal

Discharge condition No. 6 (Arboricultural Method Statement) following planning approval . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Oct 2025
✓
Consultation
3 Nov 2025
✓
Approved
23 Dec 2025

Approved on 23 Dec 2025 · Delegated Decision · Last checked 11 Oct 2026

Associated applications 9

Site constraints 4

National infrastructure project 438 m away: M42 Junction 6 Improvement
The site is 438 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI 479 m away: Coleshill and Bannerly Pools SSSI; Inside the Birmingham built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Solihull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Solihull
Application type
Discharge of Conditions
Received
21 Oct 2025
Validated
21 Oct 2025
Parish
Bickenhill Parish Council
Target decision
16 Dec 2025
Decision
Approved
Decision date
23 Dec 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Quod

How this decision compares

Decided in 63 days from validation, 6 days slower than Solihull's median of 57 for discharge of conditions. Approved, as 99% of discharge of conditions here are.

49%decided within 8 weeks
99%approved
138decided in the last year

Plota live figures for discharge of conditions decided by Solihull in the last twelve months, from validation. Solihull decision record →

Consultation & key dates

Alt. reference
PP-14427681
Planning Portal ref
PP-14427681
Consultation
3 Nov 2025
Comments by
1 Dec 2025
Statutory expiry
16 Dec 2025
Env. assessment
No
Solihull
Planning Authority Score
5.2/10
Average
#141 of 296 overall
Relevant to this application:
Householder decisions

Solihull is #148 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Solihull decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #44 of 296
94%
Householder approved
Above avg (90%) #116 of 296
65%
Decided in 8 weeks
Above avg (63%) #148 of 296
41%
Extended time limit
Below avg (41%) #160 of 296
87%
Minor dwellings approved
53 decided (1-9 homes)
88%
Major dwellings approved
8 decided (10+ homes)
90%
Change of use approved
51 decided
1,118
Total decisions
71 refused in the year to March 2026