Gate House, Unit 2 Rhs Hamm Moor Lane Addlestone Surrey KT15 2SD Data via plota.co.uk

Proposal

Retrospective application for the installation of flue and ductwork associated with a filtered extract ventilation system serving an existing vehicle paint spray booth. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 7 Oct 2026
Decision
Expected by 2 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 2 Dec 2026, from recent full applications across the UK.

Comments are open until 4 Nov 2026

Comment on this application ↗

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National infrastructure project about 1520 m away: Southampton to London Pipeline Project; Inside the Addlestone built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 8 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Runnymede - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Runnymede
Postcode
KT15 2SD
Received
around 7 Oct 2026
Validated
7 Oct 2026
Case officer
Show

Decision outlook

Day 2 of the 56-day target. Councils usually decide full applications by day 56.

Day 254 days to the 56-day target
56%decided within 8 weeks
87%approved
96,673decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Runnymede to go on. Runnymede decision record →

Consultation & key dates

Comments by
4 Nov 2026
Runnymede
Planning Authority Score
5.2/10
Average
#140 of 296 councils
Relevant to this application:
Householder decisions

Runnymede ranks #108 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Runnymede decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #242 of 296
89%
Householder approved
Below avg (90%) #208 of 296
72%
Decided in 8 weeks
Above avg (63%) #108 of 296
36%
Extended time limit
Below avg (41%) #113 of 296
66%
Minor dwellings approved
74 decided (1-9 homes)
82%
Major dwellings approved
11 decided (10+ homes)
55%
Change of use approved
11 decided
661
Total decisions
110 refused in the year to March 2026