Six holiday units at Land north of Cwm Plysgog, Cilgerran
Summary of planning committee decision
Decided by Pembrokeshire Planning Committee on 6 Oct 2026.
What was proposed
The application proposed six self-catering holiday units, a shower and toilet block, parking, access, decking and landscaping.
“The application seeks permission for the siting of six self-catering units of holiday accommodation which include decking areas, proposed access track from the highway into a car parking area, a shower/toilet block and associated landscaping including the creation of pathways.”
“The geodesic domes would have a height of approximately 4.2 metres and a diameter of approximately 6 metres. The yurts would be of a typical design with a height of approximately 3.3 metres and a diameter of approximately 6 metres. The bell tents would have a height of approximately 3.3 metres with a diameter of approximately 5 metres.”
Officer report
The site
The site is level grazing land beside Cilgerran, north of Cwm Plysgog, with hedgerow boundaries, homes nearby and buildings to the north.
“The application site is an irregular shaped parcel of grazing land located adjacent to the settlement boundary for Cilgerran. The land sits to the north of the unclassified road known as Cwm Plysgog. The site is generally level with hedgerow boundaries to the east, south and west. Dwellings located within the settlement are located to the south of the site with agricultural outbuildings addressing an established yard area located to the north of the site.”
Officer report
Why officers supported it
Officers considered the development a modest tourism scheme in a sustainable location with acceptable effects on character, amenity, highways, ecology and heritage.
“Future Wales - The National Plan 2040 (FW) adopted on 24th February 2021, is the National Development Framework for Wales. Policy 5 of FW seeks to support the rural economy through appropriate and proportionate economic growth in rural towns that is managed through Strategic Development Plans (SDPs) and Local Development Plans (LDPs).”
“Policy GN.1 (General Development Policy) supports development that is compatible with the capacity and character of the site and its surroundings, provided it does not result in a significant adverse impact on local amenity, including visual amenity. In addition, policy GN.2 (Sustainable Design) seeks to ensure that development is of a good design that is appropriate in relation to context in terms of layout, scale, siting, density, landscaping and materials.”
Officer report
Wastewater and safeguards
The wastewater condition was intended to prevent occupation before treatment works improvements, protecting the Teifi River Special Area of Conservation.
“The site is located with the Tefi Riverine Special Area of Conservation (SAC) catchment with foul flows from the site directed to a mains connection. Under the Habitats Regulations, where a development is likely to have a significant effect on the SAC the local planning authority must carry out an Appropriate Assessment (AA) of the implication of the development in view of the site’s conservation objectives.”
“The Council Ecologist has undertaken an AA, which was also reviewed by NRW, which identified potential effects arising from the increased nutrient output from the development due to failures of the flow passed forward at Cilgerran Wastewater Treatment Works (WwTW).”
Officer report
Concerns from others
The community council and seventeen letters raised concerns about traffic, parking, noise, privacy, drainage, ecology, lighting, consultation and the use of the land.
“Traffic and parking issues, limited access, increased noise levels and impact on residential amenity, change in the character of the area, issues with drainage and sewerage capacity, foul waste and impact on Plysgog Stream, no planning notice at the site, consultation not undertaken correctly.”
“Access road is too narrow, lack of parking, frequency of users 2. Noise 3. Loss of privacy, negative impact on residential amenity 4. New access to holding not necessary 5. Inaccuracies on application form 6. Foul drainage information inaccurate 7. Inappropriate use of the land 8. Surface water flooding issues 9. No public consultation or undertaken incorrectly 10. Ecological impact and impact from drainage 11. Limited public transport and potential use of it 12.”
Officer report
The committee debate
Members discussed wastewater improvements, enforcement, the access road, traffic, environmental protection and the need to add an archaeological condition.
“Councillor John Davies raised concerns regarding the reliability of Welsh Water's proposed timetable for upgrading the local wastewater treatment works and whether the highway network was capable of accommodating the development.”
“Councillor Iwan Ward sought clarification regarding the implications of the revised condition and expressed concerns regarding the suitability of the access road and the timescales for wastewater improvements, indicating that he would not support the application. Councillor John Davies also sought clarification on the interaction between the Grampian condition, the five-year implementation period and potential enforcement action.”
Minutes
The vote
The motion was approved by twelve votes to two, with no abstentions.
“The vote, undertaken by way of a roll-call, was carried. The votes were recorded as follows:”
“For the Motion: Councillors Steve Alderman, Mark Carter, John Cole, Tim Evans, Simon Hancock, Nick Neumann, Anji Tinley, Michele Wiggins, Tony Wilcox, Chris Williams, Michael Williams and Danny Young [12]”
Minutes
The decision
The application was approved subject to the recommended conditions, with an additional condition requiring an approved archaeological investigation scheme before development began.
“That the application be APPROVED subject to the conditions outlined in Section 1.1 of the report; and that an additional condition be added requiring no development to commence until a written scheme of investigation has been submitted to and approved in writing by the local planning authority and for works to be completed in accordance with the approved scheme.”
Minutes
Sources
- Pembrokeshire Planning Committee minutes, 6 October 2026
- Agenda and papers (council website)
Source: Plota analysis of Pembrokeshire's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Pembrokeshire Planning Committee
- Council
- Pembrokeshire
- Date
- Tuesday 6 October 2026
- Committee decided
- Approved
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Pembrokeshire committee decisions →
This committee's year
51 decisions in the 12 months to this meeting, 4 against officer advice.
Source: Plota analysis of the committee's minutes.