Southsea Seafront From Long Curtain Moat In The West To Eastney Marine Barracks In The East. Data via plota.co.uk

25/01479/DOC - Discharge of Condition Approved

Proposal

Application to seek approval of details reserved by conditions 2 (Phasing plan), 3 (Contaminated Land), 5a and 5b (Archaeology), 14 (Biodiversity Mitigation and Enhancement Plan), 16 (Soft Landscaping), 18 (Drainage Scheme), 19 (Construction Environmental Management Plan), 20 (Construction Traffic Management Plan), 21 (Lighting), 22 (Street Furniture), 24 (Hard Surfacing), 26 (Roads and Footpaths), 28 (Lamp Columns), 32 (Secondary defences), 34 (Primary defences) of planning permission 25/00910/VOC Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Dec 2025
✓
Validated
19 Dec 2025
✓
Consultation
7 Jan 2026
✓
Approved
10 Feb 2026

Approved on 10 Feb 2026 · Committee Decision · Last checked 3 Oct 2026

Planning committee

Decided by Portsmouth Planning Committee on 4 Feb 2026.

Approved

As officers recommended.

  • Officers advised approving the details because they would improve the promenade and integrate the sea defences sensitively.
  • A supporter and a councillor spoke in support, while members discussed the seafront and possible facilities.
  • The committee approved the specified details and delegated approval of the remaining conditions.
Read how the committee decided The proposed details, site history, officer assessment, consultation responses, public speakers, committee discussion and decision. Includes the meeting recording

Source: Plota analysis of Portsmouth's committee minutes of 4 Feb 2026.

Documents 22

All documents on the council site ↗

Associated applications 5

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 434 m away: AQUIND Interconnector
The site is about 434 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, about 595 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Portsmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Discharge of Condition
Received
17 Dec 2025
Validated
19 Dec 2025
Ward
St Thomas
Case officer
Show
Target decision
13 Feb 2026
Decision
Approve
Decision date
10 Feb 2026
Decision level
Committee Decision
Applicant
Show

How this decision compares

Decided in 53 days from validation, about the council's usual 56 days. Approved, as 100% of discharge of conditions here are.

53%decided within 8 weeks
100%approved
80decided in the last year

Plota live figures for discharge of conditions decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14571926
Planning Portal ref
PP-14571926
Consultation
7 Jan 2026
Comments by
16 Jan 2026
Committee
4 Feb 2026
Statutory expiry
13 Feb 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026