Lots Road South Formed By Chelsea Creek Car Pound Lots Road, 65-69 And 71-73 Lots Road London SW10 0RN Data via plota.co.uk

2025/02363/OBS - Observations to Other Borough Withdrawn

Proposal

Cross boundary (Royal Borough of Kensington & Chelsea and London Borough of Hammersmith & Fulham) detailed planning application for the complete demolition of existing buildings and structures and the comprehensive redevelopment to provide a mixed-use scheme comprising the creation of housing (Use Class C3) (274 homes, including affordable homes (extra care home units and general needs units)), and non-residential floorspace (2,038sqm) comprising commercial, business and service floorspace (Use Class E) and Local Community and Learning floorspace (Use Class F1 a/b and Use Class F2) in new buildings ranging from 5 to 13 storeys with basement, public realm works and other ancillary works including works to the Chelsea Creek wall, and new access arrangements from Lots Road. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
29 Aug 2025
Decision
Target date was 28 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 24 Nov 2026; it is now day 452.

Site constraints 9

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 Article 4 directions
Article 4 - No 100 · Article 4 - No 106. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Locally significant industrial site
A borough-level industrial site.
Boroughs protect these sites for industrial and related uses.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 33 m away: Thames Tideway Tunnel
The site is about 33 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 1.9 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Conservation area about 55 m away: Lots Village; 1 listed building within 150 m of the postcode pin; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for a care home?

Plota Sites searches every land parcel in England and Wales: 11,689 sites fit this search. On and off the market, free to search.

Land for care homes
Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Observations to Other Borough
Postcode
SW10 0RN
Received
29 Aug 2025
Ward
Out Of Borough
Applicant
Show

Decision outlook

Day 452, past the statutory target. 83% of other in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Oct 2026.

Day 452361 days past the 91-day target
65%decided within 8 weeks
95%approved
2,220decided in the last year

Plota live figures for other decided across the UK in the last twelve months, from validation; too few recent other in Hammersmith and Fulham to go on. Hammersmith and Fulham decision record →

Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Major dwellings

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026