25/01577/LBC - Listed Building Consent Approved

Proposal

Alterations and installation of replacement windows, air source heat pump and solar panels Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Oct 2025
✓
Validated
11 Dec 2025
✓
Approved
25 Mar 2026

Approved on 25 Mar 2026 · Delegated Decision · Last checked 4 Oct 2026

Documents 20

All documents on the council site ↗

Site constraints 3

Grade B listed: 19-19A Barossa Place, Perth
List entry LB39375 · 4 m away · 31 more listed buildings within 150 m (1 Grade A, 16 Grade B, 14 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 31 with distances
Historic Environment Scotland ↗
Perth Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Special area of conservation 413 m away: River Tay.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
Listed Building Consent
Postcode
PH1 5HH
Received
28 Oct 2025
Validated
11 Dec 2025
Ward
Perth City Centre
Parish
North Inch And Muirton
Case officer
Show
Decision
Approve the application
Decision date
25 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
F.E.M Building Design

How this decision compares

Decided in 104 days from validation, 51 days slower than Perth's median of 53 for listed building works. Approved, as 94% of listed building works here are.

63%decided within 8 weeks
94%approved
141decided in the last year

Plota live figures for listed building works decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Comments by
6 Feb 2026
Env. assessment
No