New Barnsbury Estate, London, N1 Data via plota.co.uk

P2025/1765/OUT - Outline Planning Permission Approved

Proposal

Hybrid planning application for the phased redevelopment of the New Barnsbury Estate comprising: Phased demolition of all existing buildings and structures, site preparation and enabling works (including excavation), and phased construction of 711 residential units (Use Class C3), nursery (Use Class E), and local community floorspace (Use Class F2) within 12 buildings ranging in height from 3-21 storeys (plus basements). Hard and soft landscaping works including public open space access and highway alterations, car and cycle parking provision are also proposed alongside all other associated ancillary works (No Matters Reserved for future approval (the ''detailed element'')); and Outline application for: site preparation and enabling works (including excavation) and the phased construction of buildings up to 10 storeys (plus basements) to provide up to 405 residential units (Use Class C3) and up to 1,500sqm GEA flexible commercial, business and service floorspace (Use Class E). Hard and soft landscaping works including public open space, access and highway alterations, car and cycle parking provision are also proposed alongside all other associated ancillary works (All Matters Reserved for future approval (the ''outline element'')) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jun 2025
✓
Validated
30 Jun 2025
✓
Consultation
18 Sept 2025
✓
Approved
8 May 2026

Approved on 8 May 2026 · Planning Committee · Last checked 22 Nov 2026

Documents 351

Statements & assessments 145

PDF BAE-STN-XX-00-RP-S-3504-S2-V01 - Remediation Method Statement Application Supporting Documents · 22 Jan 2026 View ↗ PDF Air Quality Positive Statement Rev.02 (Hilson Moran, 10/04/2025). Application Supporting Documents · 7 Jan 2026 View ↗ PDF Arboricultural Impact Assessment Report SHA 969 AMS S73 (Sharon Hosegood Associates, July 2024); Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-HIL-ZZ-XX-T-O-00001 - Home Quality Mark 6.0 Pre-assessment Rev.P04 (Hilson Moran, 06/03/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF ICD No.16 – Updated Hyperoptic Fibre New Supplies Proposal (Premier Energy Services Ltd, 12/08/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF EIA Statement of Conformity Application Supporting Documents · 28 Nov 2025 View ↗ PDF Addendum Internal Daylight Assessment (C8 and C9) Application Supporting Documents · 6 Nov 2025 View ↗ PDF Addendum Internal Sunlight Assessment (C8 and C9) Application Supporting Documents · 6 Nov 2025 View ↗ PDF BNG - Baseline Plan Application Supporting Documents · 17 Oct 2025 View ↗ PDF BNG - Post Development Plan Application Supporting Documents · 17 Oct 2025 View ↗ PDF Fire Strategy Statement: Phase 1B Application Supporting Documents · 15 Oct 2025 View ↗ PDF Fire Strategy Statement: Phase 3A Application Supporting Documents · 15 Oct 2025 View ↗ PDF Fire Strategy Statement: Block A3 Application Supporting Documents · 15 Oct 2025 View ↗ PDF Fire Strategy Statement: Block B1, B2 & B4 Application Supporting Documents · 15 Oct 2025 View ↗ PDF EIA - STATEMENT OF CONFORMITY Environmental Impact Assessment · 13 Oct 2025 View ↗ PDF HTVIA - STATEMENT OF CONFORMITY Environmental Impact Assessment · 13 Oct 2025 View ↗ PDF Addendum Design and Access Statement October 2025 Application Supporting Documents · 8 Oct 2025 View ↗ PDF Energy Results Breakdown Application Supporting Documents · 7 Oct 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 3 of 7 Environmental Impact Assessment · 6 Oct 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 1 of 7 Environmental Impact Assessment · 6 Oct 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 6 of 7 Environmental Impact Assessment · 6 Oct 2025 View ↗ PDF Addendum Planning Statement Application Supporting Documents · 18 Sept 2025 View ↗ PDF Operational Waste Management Strategy – Statement of Conformity Application Supporting Documents · 18 Sept 2025 View ↗ PDF Arboriculture Statement of Conformity Application Supporting Documents · 16 Sept 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 7 of 7 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 12 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch10_DSO_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 7 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 4 of 7 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch12_Climate Change_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 5 of 7 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Archaeological Technical Note - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 13 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Biodiversity Net Gain Assessment Application Supporting Documents · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch11_Wind_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Circular Economy Statement Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 1 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 2 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 3 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Ecological Impact Assessment - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Energy Statement Application Supporting Documents · 15 Sept 2025 View ↗ PDF Equality Statement - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Environmental Statement: Non-Technical Summary Application Supporting Documents · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch1-5_Introduction_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch6_Socio_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol3_Appendices Noise and Vibration_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol3_Appendices DLSL and Overshadowing_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 2 of 7 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch8_Air Quality_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol3_Appendices Introduction_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum Vol2_HTVIA_Sept 2025_Part 4 of 7 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch9_Noise Vibration_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Flood Risk Assessment and Drainage Strategy - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Phase 1 Ground Condition Assessment - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Health Impact Assessment - Statement of Conformity and Responses Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 9 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 6 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF NB_ES Addendum_Vol1_Ch7_Traffic_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 4 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 10 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Outline Lighting Strategy - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Outline Construction Management Plan - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF ES Addendum_Vol1_Ch13_Summary and Conclusions_Sept 2025 Environmental Impact Assessment · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 5 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Sustainable Design and Construction Statement Application Supporting Documents · 15 Sept 2025 View ↗ PDF Structural Method Statement - Basement Impact Assessment - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Summary of Revisions to Sustainability and Energy Reports Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 8 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Transport Assessment Addendum Application Supporting Documents · 15 Sept 2025 View ↗ PDF Design and Access Statement_Sept 2025_Part 11 of 13 Application Supporting Documents · 15 Sept 2025 View ↗ PDF Utliity and Foul Drainage Report - Statement of Conformity Application Supporting Documents · 15 Sept 2025 View ↗ PDF Whole Life-Cycle Carbon Assessment Application Supporting Documents · 15 Sept 2025 View ↗ PDF Planning and Affordable Housing Statement Application Supporting Documents · 18 Jul 2025 View ↗ PDF Floor Risk Assessment and Sustainable Drainage Statement PART 1 Application Supporting Documents · 14 Jul 2025 View ↗ PDF Floor Risk Assessment and Sustainable Drainage Statement PART 2 Application Supporting Documents · 14 Jul 2025 View ↗ PDF Floor Risk Assessment and Sustainable Drainage Statement PART 3 Application Supporting Documents · 14 Jul 2025 View ↗ PDF Floor Risk Assessment and Sustainable Drainage Statement PART 4 Application Supporting Documents · 14 Jul 2025 View ↗ PDF Applicant's Financial Viability Assessment Application Supporting Documents · 27 Jun 2025 View ↗ PDF Applicant's Financial Viability Assessment - Appendices Application Supporting Documents · 27 Jun 2025 View ↗ PDF Archaeological Desk Based Assessment Application Supporting Documents · 24 Jun 2025 View ↗ PDF Arboricultural Impact Assessment Application Supporting Documents · 24 Jun 2025 View ↗ PDF Bat Survey Application Supporting Documents · 24 Jun 2025 View ↗ PDF BNG Metric Application Supporting Documents · 24 Jun 2025 View ↗ PDF Ecological Impact Assessment Application Supporting Documents · 24 Jun 2025 View ↗ PDF Flood Risk Assessment and Surface Water Drainage Strategy Application Supporting Documents · 24 Jun 2025 View ↗ PDF Phase 1 Ground Condition Assessment Part 1 of 2 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Phase 1 Ground Condition Assessment Part 2 of 2 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Preliminary Ecological Appraisal Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 1/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 2/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utlity and Foul Drainage Report - Appendices 3/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 4/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 5/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 6/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Utility and Foul Drainage Report - Appendices 7/7 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Transport Assessment Application Supporting Documents · 24 Jun 2025 View ↗ PDF Social and Community Infrastructure Statement Application Supporting Documents · 24 Jun 2025 View ↗ PDF Statement of Community Involvement Application Supporting Documents · 24 Jun 2025 View ↗ PDF Equality Statement Application Supporting Documents · 24 Jun 2025 View ↗ PDF Structural Method Statement - Basement Impact Assessment Part 1 of 4 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Structural Method Statement - Basement Impact Assessment Part 2 of 4 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Structural Method Statement - Basement Impact Assessment Part 3 of 4 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Structural Method Statement - Basement Impact Assessment Part 4 of 4 Application Supporting Documents · 24 Jun 2025 View ↗ PDF Health Impact Assessment Application Supporting Documents · 24 Jun 2025 View ↗ PDF Barnsbury Transport Assessment (Appendices) Application Supporting Documents · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 1 Introduction Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 10/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 11/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 12/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 2/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 2 - Methodology 1/12 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 3 - Air Quality Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 5 - Daylight, Sunlight and Overshadowing 1/5 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 5 - Daylight, Sunlight and Overshadowing 2/5 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 5 - Daylight, Sunlight and Overshadowing 3/5 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 5 - Daylight, Sunlight and Overshadowing 4/5 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 5 - Daylight, Sunlight and Overshadowing 5/5 Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 6 - Wind and Microclimate Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 7 - Climate Change Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 10: Daylight, Sunlight and Overshadowing Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 11: Wind and Microclimate Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 12: Climate Change Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 13: Effect Interactions Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 14: Likely Significant Effects Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 1: Introduction Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 2: EIA Methodology Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 3: Alternatives and Design Evolution Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 4: Proposed Development Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 5: Demolition and Construction Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 6: Socio-Economics Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 7: Traffic and Movement Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 8: Air Quality Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 9: Noise and Vibration Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 1, Chapter 15: Mitigation and Monitoring Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 2: Heritage, Townscape Visual Impact Assessment (Part 1 of 2) Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 2: Heritage, Townscape Visual Impact Assessment (Part 2 of 2) Environmental Impact Assessment · 24 Jun 2025 View ↗ PDF Environmental Impact Assessment Volume 3: Appendix 4 - Noise and Vibration Environmental Impact Assessment · 24 Jun 2025 View ↗

Plans & drawings 144

PDF B1A01-FHX-PR-00-D-L-00404 Rev.C02 – Carnegie Park Soft Landscape Plan Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-A3-00-D-L-00001 Rev. T02 – General Arrangement Plan Block A3 and Jays Lane (Farrer Huxley, 04/08/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-FHX-BB-00-D-L-00002 Rev. T02 – General Arrangement Plan Block B (Farrer Huxley, 26/05/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF Construction Logistics and Environmental Management Plan Rev.P04 (Mount Anvil, 29/05/2025) Application Supporting Documents · 7 Jan 2026 View ↗ PDF Phase Plan C6-9 Level 102 C05 Drawings - Proposed - Plans · 28 Nov 2025 View ↗ PDF Illustrative Masterplan P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF General Arrangement Roof Plan P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Plan Block A3 B1/2/3/4 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Plan Block B5 6 7 8 & Carnegie Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Plan Block C6/7/8/9 & Pultney Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Plan Block D1 2 3 P1 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Roof Plan Block B5 6 7 8 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Landscape GA Roof Plan Block D1 2 3 P1 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Sitewide Hard Landscape Plan P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Hard Landscaping Plan Block A3 B1/2/3/4 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Hard Landscaping Plan Block B5 6 7 8 & Carnegie Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Hard Landscaping Plan Block C 6 7 8 9 & Pultney Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Hard Landscaping Plan Block D1 2 3 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Sitewide Soft Landscape Plan P2 Annotated Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Sitewide Soft Landscape Plan P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Soft Landscaping Plan Block A3 B1/2/3/4 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Soft Landscaping Plan Block B5 6 7 8 & Carnegie Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Soft Landscaping Plan Block C 6 7 8 9 & Pultney Park P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Soft Landscaping Plan Block D1 2 3 P2 Drawings - Proposed - Landscaping · 14 Nov 2025 View ↗ PDF Barnsbury Community Space management plan Application Supporting Documents · 12 Nov 2025 View ↗ PDF Elevations - Block A3 C04 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Detailed Elevation Section - A3 North C04 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Elevations - Block B1 B2 B3 C04 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Elevations - Block B1-B4 C04 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Elevations - Block B1-B4 - Internal Elevations C04 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Proposed Site Elevations A-D C07 Drawings - Proposed - Elevations · 12 Nov 2025 View ↗ PDF Phase Plan B3-9 Level 105 C03 Drawings - Proposed - Plans · 7 Nov 2025 View ↗ PDF Phase Plan B3-9 Level 106 C03 Drawings - Proposed - Plans · 7 Nov 2025 View ↗ PDF Phase Plan B3-9 Level 107 C02 Drawings - Proposed - Plans · 7 Nov 2025 View ↗ PDF Phase Plan B3-9 Level 110 C02 Drawings - Proposed - Plans · 7 Nov 2025 View ↗ PDF Masterplan GA Plan - Level 107 C04 Drawings - Proposed - Site Layout · 7 Nov 2025 View ↗ PDF Masterplan GA Plan - Level 121 C04 Drawings - Proposed - Site Layout · 7 Nov 2025 View ↗ PDF Phase Plan B3-9 Level 102 C05 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Phase Plan B3-9 Level 103 C04 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Phase Plan B3-9 Level 104 C03 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Elevations - Block B5-B9 - Internal Elevations C03 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Phase Plan D1-3 Level 100 C03 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Phase Plan D1-3 Level 101 C03 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Elevations - Block D1 (1 of 2) C03 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Elevations - Block D2 (1 of 2) C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Elevations - Block D3 (1 of 2) C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Elevations - Block D3 (2 of 2) C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Elevations - Block D1 (2 of 2) C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Elevations - Block D2 (2 of 2) C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Detailed Elevation Section - D2 West C04 Drawings - Proposed - Elevations · 31 Oct 2025 View ↗ PDF Masterplan GA Plan - Level 100 C05 Drawings - Proposed - Plans · 31 Oct 2025 View ↗ PDF Masterplan GA Plan - Level 101 C04 Drawings - Proposed - Site Layout · 31 Oct 2025 View ↗ PDF Masterplan GA Plan - Level 103 C03 Drawings - Proposed - Site Layout · 31 Oct 2025 View ↗ PDF SUPERSEDED - Elevations - Block B5-B9 C04 Drawings - Proposed - Elevations · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 100 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 101 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 103 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 104 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 105 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Phase Plan C6-9 Level 106 C04 Drawings - Proposed - Plans · 8 Oct 2025 View ↗ PDF Detailed Elevation Section - D2 North & East C03 Drawings - Proposed - Elevations · 8 Oct 2025 View ↗ PDF Phase Plan B3-9 Level 100 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Phase Plan C6-9 Level 107 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Phase Plan C6-9 Level 108 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Phase Plan C6-9 Level 099 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Elevations - Block C7-C9 C03 Drawings - Proposed - Elevations · 15 Sept 2025 View ↗ PDF Elevations - Block C7-C9 - Internal Elevations C03 Drawings - Proposed - Elevations · 15 Sept 2025 View ↗ PDF Phase 1A GA Plan - Level 100 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Phase 1A GA Plan - Level 099 C03 Drawings - Proposed - Plans · 15 Sept 2025 View ↗ PDF Proposed Site Sections A-D C03 Drawings - Proposed - Sections · 15 Sept 2025 View ↗ PDF Proposed Site Sections E-I C03 Drawings - Proposed - Sections · 15 Sept 2025 View ↗ PDF Masterplan GA Plan - Level 099 C03 Drawings - Proposed - Site Layout · 15 Sept 2025 View ↗ PDF Parameter Plan - Building Heights Plan C03 Drawings - Proposed - Site Layout · 15 Sept 2025 View ↗ PDF Green Performance Plan Application Supporting Documents · 15 Sept 2025 View ↗ PDF Proposed Heights Plan - Detailed Phases Only Application Supporting Documents · 12 Sept 2025 View ↗ PDF Proposed Ground Floor Massing Plan - Proposed vs. Consented Application Supporting Documents · 12 Sept 2025 View ↗ PDF BAM-PTE-ZZ-XX-DR-A-100008 Demolition Phasing Plan Drawing Submission · 14 Jul 2025 View ↗ PDF Phase Plan D1-3 Level 102 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 103 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 104 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 105 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 106 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 107 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 108 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 109 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 110 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 111 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 112 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 113 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 114 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 115 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 116 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 117 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 118 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 119 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 120 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 099 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase Plan D1-3 Level 121 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 101 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 102 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 103 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 104 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 105 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 106 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 107 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Phase 1A GA Plan - Level 108 C02 Drawings - Proposed - Plans · 25 Jun 2025 View ↗ PDF Existing Site Sections A - D C01 Drawings - Existing Sections · 25 Jun 2025 View ↗ PDF Existing Site Sections E - I C01 Drawings - Existing Sections · 25 Jun 2025 View ↗ PDF Detailed Elevation Section - B10 Community Centre South C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - B9 South C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - B1 West C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - B1 East C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - B1 Gateway C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - B4 South C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Elevations - Block C6 C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - C6 South C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Detailed Elevation Section - C8 North C02 Drawings - Proposed - Elevations · 24 Jun 2025 View ↗ PDF Site Location Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Existing Site Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Newlon Ownership Boundary Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Existing Topographical Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Proposed Topographical Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Site Plan with Proposed and Existing Footprint C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Indicative Phasing Plan C02 Drawing Submission · 24 Jun 2025 View ↗ PDF Parameter Plan - Demolition Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Hybrid Application Boundary C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Building Plots Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Land Use Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Access and Movement Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Landscape and Open Space Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Parameter Plan - Basement Plan C02 Drawings - Proposed - Site Layout · 24 Jun 2025 View ↗ PDF Drawing Schedule Application Supporting Documents · 24 Jun 2025 View ↗ PDF General Arrangement Plan P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Detailed Area Location Plan P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Sitewide Levels Strategy Plan P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Levels Plan Block A3 B1/2/3/4 P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Levels Plan Block B5 6 7 8 & Carnegie Park P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Levels Plan Block C6/7/8/9 & Pultney Park P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Levels Plan Block D1 2 3 P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Landscape Sections - Block A3 B1/2/3/4 P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Landscape Sections - Block C6/7/8/9 & Pultney Park 1/2 P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Landscape Sections - Block C6/7/8/9 & Pultney Park 2/2 P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Landscape Sections - Block D1/2/3 & Carnegie Park P1 Drawings - Proposed - Landscaping · 24 Jun 2025 View ↗ PDF Outline Construction Management Plan Application Supporting Documents · 24 Jun 2025 View ↗

Other documents 54

PDF Completed S106 Agreement 07_05_2026 Legal Agreement · 7 May 2026 View ↗ PDF Draft S106 Agreement Legal Agreement · 5 May 2026 View ↗ PDF Council (BPS) Viability Review Addendum - Oct 2025 Application Supporting Documents · 26 Feb 2026 View ↗ PDF Play equipment Maintenance Guide Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-00-D-L-00004 Rev.C01 – Carnegie Park General Arrangement Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-00-D-L-00801 Rev.C01 – Carnegie Park Play Equipment Details Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-00-D-L-00802 Rev.C01 – Carnegie Park Play Equipment Details Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-00-D-L-00803 Rev.C01 – Carnegie Park Play Equipment Details Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-ZZ-T-L-00005 Rev.P01– Landscape Maintenance & Management Report Application Supporting Documents · 3 Feb 2026 View ↗ PDF B1A01-FHX-PR-ZZ-S-L-00001 Rev.P01 – Phase 1A Planting Schedule Application Supporting Documents · 3 Feb 2026 View ↗ PDF 22/3755-GIR-F01 - Factual Ground Investigation Report Rev.01 Application Supporting Documents · 22 Jan 2026 View ↗ PDF BAE-STN-XX-00-RP-S-3503-S2-V01 - Ground Investigation Report Application Supporting Documents · 22 Jan 2026 View ↗ PDF B1A01-FHX-PR-ZZ-T-L-00003 – Phase 1A Green Roof Document (Farrer Huxley, September 2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-FHX-PR-ZZ-T-L-00004 – Phase 1A Habitat Document (Farrer Huxley, September 2025). Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-PTA-XX-XX-D-C-09021 Rev.P01 – Cut & Fill – Stage 1 Sheet Piling (PTA, February 2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-PTA-XX-XX-D-C-09022 Rev.P01 – Cut & Fill – Stage 2 Sheet Piling (PTA, February 2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF B1A01-RMA-ZZ-ZZ-D-A-19000 Rev.P03 – Sitewide Roof Type Keyplan (RM_A, 01/12/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF ICD No.15 – Updated Openreach Fibre New Supplies Proposal and Design (Openreach, 15/07/2025); Application Supporting Documents · 7 Jan 2026 View ↗ PDF P854 - Barnsbury Estate Regeneration. Phase 1a – Landscape Specifications (Farrer Huxley, 09/092025). Application Supporting Documents · 7 Jan 2026 View ↗ PDF Waste Streams Letter (MCM); Application Supporting Documents · 7 Jan 2026 View ↗ PDF Council (BPS) Review of Financial Viability Appraisal 08-12 Application Supporting Documents · 9 Dec 2025 View ↗ PDF WATERMAN FINAL EIA REVIEW Application Supporting Documents · 7 Dec 2025 View ↗ PDF DS2 FVA 01_12_25 Application Supporting Documents · 7 Dec 2025 View ↗ PDF Addendum Cover Letter Application Supporting Documents · 7 Dec 2025 View ↗ PDF Development Specification Application Supporting Documents · 28 Nov 2025 View ↗ PDF Applicant's Viability Update November 2025 Application Supporting Documents · 20 Nov 2025 View ↗ PDF Landscaping DAS Addendum - B10 Terrace Updates Application Supporting Documents · 12 Nov 2025 View ↗ PDF Rehousing and Phasing Note Application Supporting Documents · 6 Nov 2025 View ↗ PDF Rehousing and Overcrowding Note Application Supporting Documents · 28 Oct 2025 View ↗ PDF Rehousing and Phasing Note Application Supporting Documents · 28 Oct 2025 View ↗ PDF VSC Results - Outline Phases Application Supporting Documents · 17 Oct 2025 View ↗ PDF Daylight Distribution - Extant vs Proposed (FOR INFORMATION ONLY) Application Supporting Documents · 17 Oct 2025 View ↗ PDF Updated FVIA - Septemebr 2025 Application Supporting Documents · 14 Oct 2025 View ↗ PDF Schedule of Accommodation - GEA Application Supporting Documents · 13 Oct 2025 View ↗ PDF Schedule of Accommodation - GIA Application Supporting Documents · 13 Oct 2025 View ↗ PDF Schedule of Accommodation - NSA Application Supporting Documents · 13 Oct 2025 View ↗ PDF October 2025 Update Cover Letter Application Supporting Documents · 8 Oct 2025 View ↗ PDF Pre-Demolition Audit Pre-Demolition Audit · 7 Oct 2025 View ↗ PDF CIL - Covering Letter Default · 15 Sept 2025 View ↗ PDF CIL Addendum Information Default · 15 Sept 2025 View ↗ PDF Design Code Application Supporting Documents · 15 Sept 2025 View ↗ PDF GLA Circular Economy Template Application Supporting Documents · 15 Sept 2025 View ↗ PDF Internal Daylight and Sunlight Addendum Report Application Supporting Documents · 15 Sept 2025 View ↗ PDF Whole Life-Cycle Carbon Template (Detailed) Application Supporting Documents · 15 Sept 2025 View ↗ PDF Whole Life-Cycle Carbon Template (Outline) Application Supporting Documents · 15 Sept 2025 View ↗ PDF GLA Viability Review GLA Viability Review · 19 Aug 2025 View ↗ PDF GLA - Stage 1 Letter GLA - Stage 1 Letter · 12 Aug 2025 View ↗ PDF GLA - Stage 1 Report GLA - Stage 1 Report · 12 Aug 2025 View ↗ PDF Council (BPS) Viability Review - Aug 2025 Application Supporting Documents · 11 Aug 2025 View ↗ PDF Internal Daylight and Sunlight Report Application Supporting Documents · 24 Jun 2025 View ↗ PDF Cover Letter Application Supporting Documents · 24 Jun 2025 View ↗ PDF Lighting Design Review Application Supporting Documents · 24 Jun 2025 View ↗ PDF Outline Lighting Strategy Application Supporting Documents · 24 Jun 2025 View ↗ PDF Operational Waste Management Strategy Application Supporting Documents · 24 Jun 2025 View ↗

All documents on the council site ↗

Associated applications 10

Site constraints 17

Article 4 directionLocal Flood Risk Zone (LFRZ)Critical Drainage Group3_006CITY ROAD - ST JOHNS WOOD 2CITY ROAD - ST JOHNS WOOD 1Barnsbury EstateCaledonian Road (Copenhagen Street) Local Shopping AreaRegent's CanalBarnsbury and Laycock Liveable NeighbourhoodWithin 50m of BarnsburyWithin 50m ofLBI TPO (NO.407) 2009 Barnsbury Estate
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Local Flood Risk Zone (LFRZ)Council record
Recorded by the council for this site.
Council site ↗
Critical Drainage Group3_006Council record
Recorded by the council for this site.
Council site ↗
CITY ROAD - ST JOHNS WOOD 2Council record
Recorded by the council for this site.
Council site ↗
CITY ROAD - ST JOHNS WOOD 1Council record
Recorded by the council for this site.
Council site ↗
Barnsbury EstateCouncil record
Recorded by the council for this site.
Council site ↗
Caledonian Road (Copenhagen Street) Local Shopping AreaCouncil record
Recorded by the council for this site.
Council site ↗
Regent's CanalCouncil record
Recorded by the council for this site.
Council site ↗
Barnsbury and Laycock Liveable NeighbourhoodCouncil record
Recorded by the council for this site.
Council site ↗
Within 50m of BarnsburyCouncil record
Recorded by the council for this site.
Council site ↗
Within 50m ofCouncil record
Recorded by the council for this site.
Council site ↗
LBI TPO (NO.407) 2009 Barnsbury EstateCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
1 listed building within 150 m; Inside the Islington built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square; Conservation area 100 m away: Regent's Canal West.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Outline Planning Permission
Received
17 Jun 2025
Validated
30 Jun 2025
Ward
Barnsbury
Case officer
Show
Target decision
21 Aug 2025
Decision
Approve with conditions and legal agreement
Decision date
8 May 2026
Decision level
Planning Committee
Applicant
Show
Agent
DP9 Ltd

How this decision compares

Decided in 312 days from validation, 234 days slower than Islington's median of 78 for outline applications. Approved, as 62% of outline applications here are.

36%decided within 8 weeks
62%approved
13%go to committee

Plota live figures for outline applications decided across the UK in the last twelve months, from validation; too few recent outline applications in Islington to go on. Islington decision record →

Consultation & key dates

Alt. reference
PP-14032576
Comments by
16 Oct 2025
Site or press notice
18 Sept 2025
Committee
9 Dec 2025
Statutory expiry
22 Dec 2025
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 overall
Relevant to this application:
Major dwellings

Islington is slower than most councils at deciding householder applications: #260 of 296 on speed. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026