Hotel Majestic Duke Street Barrow-In-Furness Cumbria LA14 1HP Data via plota.co.uk

B18/2026/0295 Approved

Proposal

Replacement of 10 dormer windows and 2 rear first floor windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 7 Aug 2026
✓
Approved
10 Sept 2026

Approved on 10 Sept 2026 · Delegated · Last checked 19 Oct 2026

Documents 45

Other documents 27

PDF Majestic Hotel Barrow - in -Furness LA14 1HP - Dated 23.04.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-S1-XX-DP-A-1550 - Plan_Site Location - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF Schedule of Works - Rev P03 - Dated 07.08.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-R1-DP-A-2205 - GA Plan_R1 Roof - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-B1-DP-A-2200 - GA Plan_B1 Basement - Rev 4 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-B1-DP-A-2100 - Demolition Plan_B1 Basement - Rev P03 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-B1-DP-A-2000 - GA Plan_B1 Basement Existing - Rev 04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-03-DP-A- 2409 - Plan_Ceiling_03 Third Floor Demolition - Rev P02 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-03-DP-A-2204- GA Plan_03 Third Floor- Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-03-DP-A-2118 - Scope of Works Plan_03 Third Floor - Rev P02 - Dated 07.08.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-03-DP-A-2104 - Demolition Plan_03 Third Floor - Revision P03 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-03-DP-A-2004 - GA Plan_03 Third Floor Existing - Rev p04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-02-DP-A2408- Plan_Ceiling_02 Second Floor Demolition - Rev P02- Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-02-DP-A-2203- GA Plan_02 Second Floor - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-02-DP-A-2117 - Scope of Works Plan_02 Second Floor - Rev P02 - Dated 07.08.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-02-DP-A-2103 - Demolition Plan_02 Second Floor - Rev P03 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-02-DP-A-2003 - GA Plan_02 Second Floor Existing - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-01-DP-A2407- Plan_Ceiling_01 First Floor Demolition - Rev P02 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-01-DP-A-2202 - GA Plan_01 First Floor - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-01-DP-A-2116 - Scope of Works Plan_01 First Floor - Rev P01 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-01-DP-A-2102 - Demolition Plan_01 First Floor - Rev P03 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-01-DP-A-2002 - GA Plan_01 First Floor Existing - Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-00-DP-A-2406- Plan_Ceiling_00 -Ground Floor Demolition - Rev P02 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-00-DP-A-2201 - GA Plan_00 Ground Floor - Rev P04 - dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-00-DP-A-2110 - Scope of Works Plan_00 Ground Floor - REV P03- Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-00-DP-A-2101 - Demolition Plan_00 Ground Floor - Rev P03 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗ PDF MHB-FEA-B1-00-DP-A-2001- GA Plan_00 Ground Floor Existing- Rev P04 - Dated 11.06.2026 Document · 18 Aug 2026 View ↗

All documents on the council site ↗

Site constraints 3

7 listed buildings within 150 m of the postcode pin
Nearest: Hotel Majestic, Grade II, about 30 m from the postcode pin · 1 Grade II*, 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 7 with distances
Historic England ↗
Heritage at risk: Central Barrow
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Also on the record
Inside the Barrow-in-Furness built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westmorland and Furness - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
LA14 1HP
Received
around 7 Aug 2026
Validated
7 Aug 2026
Case officer
Show
Decision
APPCOND
Decision date
10 Sept 2026
Decision level
Delegated

How this decision compares

Decided in 34 days from validation, 27 days faster than Westmorland and Furness's median of 61 for extensions. Approved, as 94% of extensions here are.

39%decided within 8 weeks
94%approved
402decided in the last year

Plota live figures for extensions decided by Westmorland and Furness in the last twelve months, from validation. Westmorland and Furness decision record →

Consultation & key dates

Consultation
11 Aug 2026
Comments by
11 Sept 2026
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 overall
Relevant to this application:
Householder decisions

Westmorland and Furness is slower than most councils at deciding householder applications: #235 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Westmorland and Furness decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026