10 - 16 King Edward Street Perth PH1 5UT Data via plota.co.uk

26/00886/FLL - planning permission local Approved

Proposal

Installation of replacement ATM, plant and protective barrier Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Jun 2026
✓
Validated
17 Jul 2026
✓
Approved
21 Aug 2026

Approved on 21 Aug 2026 · Last checked 26 Aug 2026

Documents 21

All documents on the council site ↗

Site constraints 3

Grade B listed: 108, 110, 112 High Street, Perth
List entry LB39482 · 23 m away · 37 more listed buildings within 150 m (1 Grade A, 28 Grade B, 8 Grade C)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 37 with distances
Historic Environment Scotland ↗
Perth Central conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Special area of conservation 258 m away: River Tay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Perth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Perth
Application type
planning permission local
Postcode
PH1 5UT
Received
24 Jun 2026
Validated
17 Jul 2026
Ward
Perth City Centre
Parish
Central
Case officer
Show
Decision
Approve the application
Decision date
21 Aug 2026
Applicant
Show
Agent
Aitken Turnbull Architects

How this decision compares

Decided in 35 days from validation, 24 days faster than Perth's median of 59 for commercial and major works. Approved, as 91% of commercial and major works here are.

46%decided within 8 weeks
91%approved
5%go to committee

Plota live figures for commercial and major works decided by Perth in the last twelve months, from validation. Perth decision record →

Consultation & key dates

Env. assessment
No