Parish Church Of Saints Peter And Paul Bell Lane Blockley Gloucestershire Data via plota.co.uk
Proposal
New below ground services through churchyard, new SVP and WC ventilation grille, all to facilitate internal reordering. New tarmac path from existing path to west tower door. Replacement of in-situ concrete roof slab over basement, installation of 2no. Air Source Heat Pumps (ASHP) and extending existing metal railings to perimeter of new roof slab Data via plota.co.uk
Application progress
Under consideration
No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 63.
Documents 9
Statements & assessments 5
Application forms 2
Site constraints 8
Show the other 48 with distances
- 2 mChurch GatesGrade II
- 4 mPremises of Mrs I Mumford (to East of Midland Bank)Grade II
- 10 mMidland Bank and Shop Premises to WestGrade II
- 15 mChurch RoomGrade II
- 19 mThe VicarageGrade II
- 22 mBoundary Wall of Vicarage to ChurchyardGrade II
- 24 mOld Bell CottageGrade II
- 25 mBell HouseGrade II
- 25 mRailed Enclosure Close to South West Corner of TowerGrade II
- 27 mRailed Enclosure to North West of North AisleGrade II
- 31 mRailed Enclosure and Tombs to Westmacott FamilyGrade II
- 32 mBritish Legion Club and Branch LibraryGrade II
- 32 mParish Church of Saint Peter and Saint Paul Parish Church of Saints Peter and PaulGrade II*
- 38 mSteps and Urns to South of Vicarage PorchGrade II
- 43 mRailed Enclosure and Tombs to Wilkes FamilyGrade II
- 46 mK6 kioskGrade II
- 46 mChurchyard Gate and Gateposts to East of British Legion ClubGrade II
- 47 mThomas Robertson Tomb and RailingsGrade II
- 53 mDrinking FountainGrade II
- 57 mThe Manor HouseGrade II*
- 60 mR and L Holts Post OfficeGrade II
- 69 mOutbuilding to North East of Balhatchet, the ButchersGrade II
- 71 mElizabeth Pengree MemorialGrade II*
- 75 mPaxton HouseGrade II
- 75 mBale Tomb Close to South East Corner of ChancelGrade II
- 77 mJohn Philips Tomb and RailingsGrade II
- 80 mJohn Franklin Tomb and RailingsGrade II
- 80 mLarge Railed Enclosure to South of Henry Franklin TombGrade II
- 81 mAnne Philips Tomb and RailingsGrade II
- 83 mHenry Franklin Tomb and RailingsGrade II
- 84 mRailed Enclosure to North East of John Philips TombGrade II
- 86 mBalhatchet, the ButchersGrade II
- 92 mBalhatchet the GrocersGrade II
- 93 mGiant Terrace to South of the Manor HouseGrade II
- 95 mVillage HallGrade II
- 96 mLittle ManorGrade II
- 100 mThe Old Royal Oak, Hainault and Bankside CottagesGrade II
- 104 mNorthwick HomeGrade II
- 105 mSchool House, Blockley Junior School and North West Boundary WallGrade II
- 121 mLower TerraceGrade II
- 124 mBankside, the Silk Mill and the GranaryGrade II
- 133 mLower Brook House, Hotel and RestaurantGrade II
- 137 mRaised Pavement Between the Old Royal Oak and Jasmine CottageGrade II
- 139 mCoachhouse, Gate Piers and Wall to Colebrook HouseGrade II
- 139 mJasmine Cottage, North East PartGrade II
- 141 mColebrook House and Railings to RoadGrade II
- 145 mJasmine Cottage, South West BlockGrade II
- 147 mBijou Cottage Numbers 1, 2 and 3 (Crown Cottage) and North East Boundary RailingsGrade II
Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Cotswold - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Brown House Station Road Blockley Moreton-In-Marsh Gloucestershire GL56 9DZ
New access to dwelling including gates, stone wall and piers, and timber fence
1 Mill Close Blockley Moreton-In-Marsh Gloucestershire GL56 9DN
Replacement of the existing front entrance timber door and frame with a bespoke ...
Serendipity Station Road Blockley Moreton-In-Marsh Gloucestershire GL56 9DZ
Repositioning of entrance gates, with the construction of new stone piers and th...
4 Lower Terrace Lower Street Blockley Moreton-In-Marsh Gloucestershire GL56 9DS
Compliance with condition 3 (Works to rear ground floor opening) of consent 26/0...
Old Chapel High Street Blockley Moreton-In-Marsh Gloucestershire GL56 9EX
1 Conifer by wall and steps - take out two lower branches. 2 Mahonia - take out ...
Greenhills High Street Blockley Moreton-In-Marsh Gloucestershire GL56 9HB
Compliance with condition 6 (fenestration details) of permission 22/01956/FUL - ...
Important details
Decision outlook
Day 63, past the statutory target. 87% of extensions in Cotswold are decided within thirteen weeks, which runs to 6 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.
Plota live figures for extensions decided by Cotswold in the last twelve months, from validation. Cotswold decision record →
Public comments
No public comments yet.
24 neighbours consulted · Last counted 7 Oct 2026
Consultation & key dates
- Comments by
- 7 Sept 2026
- Statutory expiry
- 2 Oct 2026
- Env. assessment
- No
Historical activity at this location
25 nearby applications on record - archival context, not part of the live application.
Nearby activity
Cotswold is slower than most councils at deciding householder applications, ranking #219 out of 296. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use
Track this application
Parish Church Of Saints Peter And Paul Bell Lane Blockley Gloucestershire
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.

The consultation period closed on 7 Sept 2026.