Unit 1 Keypoint Thornhill Road South Marston Swindon SN3 4RY Data via plota.co.uk

S/26/0987 - Full Planning Application Application Pending Decision

Proposal

Installation of external plant and extraction systems, including dust and fume extraction plant, compressor equipment, air handling equipment and associated louvres / vents, erection of a timber plant enclosure and external storage pavilion, and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2026
✓
Validated
10 Aug 2026
✓
Consultation
18 Aug 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 30 Oct 2026, from Swindon's recent commercial and major works.

Comments are open until 30 Oct 2026

Comment on this application ↗

Site constraints 3

Also on the record
Radon affected area, class 3; Inside the Stratton St Margaret built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area160 m² (1,722 sq ft)
Energy ratingD (65 out of 100), could reach B
PropertySemi-detached house, 8 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSandstone or limestone, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Swindon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Swindon
Application type
Full Planning Application
Postcode
SN3 4RY
Received
7 Aug 2026
Validated
10 Aug 2026
Ward
South Marston
Parish
South Marston
Case officer
Show
Target decision
9 Nov 2026
Applicant
Show
Agent
allPlanning Limited

Decision outlook

Day 60, past the statutory target. 85% of commercial and major works in Swindon are decided within thirteen weeks, which runs to 9 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Oct 2026.

Day 6022 days to the predicted decision (day 82)
46%decided within 8 weeks
88%approved
7%go to committee

Plota live figures for commercial and major works decided by Swindon in the last twelve months, from validation. Swindon decision record →

Public comments

No public comments yet.

6 neighbours consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PLP-00005345
Neighbours
18 Aug 2026
Consultation
18 Aug 2026
Comments by
30 Oct 2026
Site or press notice
9 Oct 2026
Statutory expiry
9 Nov 2026
Env. assessment
No
Swindon
Planning Authority Score
7.7/10
Good
#37 of 296 councils
Relevant to this application:
Householder decisions

Swindon is one of the fastest councils in England for householder decisions, ranking #12 out of 296. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Swindon decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #119 of 296
91%
Householder approved
Above avg (90%) #182 of 296
92%
Decided in 8 weeks
Above avg (63%) #12 of 296
15%
Extended time limit
Below avg (41%) #12 of 296
76%
Minor dwellings approved
70 decided (1-9 homes)
81%
Major dwellings approved
26 decided (10+ homes)
84%
Change of use approved
83 decided
866
Total decisions
89 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.