Lumby Nurseries Great North Road South Milford LS25 5LE Data via plota.co.uk

SELZG2026/0101/FUL - Full permission Registered

Proposal

Use of land for hard standing and storage of goods associated with the garden centre use (retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Feb 2026
✓
Validated
12 Mar 2026
✓
Consultation
26 Mar 2026
Decision
Expected by 7 May 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 211.

The consultation period closed on 16 Apr 2026.

Site constraints 7

Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 234 m away: Yorkshire GREEN
The site is 234 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Light Valley Solar (under examination, 1172 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Priority habitat 36 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Full permission
Postcode
LS25 5LE
Received
3 Feb 2026
Validated
12 Mar 2026
Ward
Monk Fryston & South Milford
Parish
South Milford
Case officer
Show
Target decision
7 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Rchitecture Ltd

Decision outlook

Day 211, past the statutory target. 74% of commercial premises in Selby are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Oct 2026.

Day 211155 days past the 56-day target
47%decided within 8 weeks
74%approved
49decided in the last year

Plota live figures for commercial premises decided by Selby in the last twelve months, from validation. Selby decision record →

Public comments

No public comments yet.

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14612141
Planning Portal ref
PP-14612141
Consultation
26 Mar 2026
Comments by
16 Apr 2026
Site or press notice
18 Mar 2026
Statutory expiry
7 May 2026
Env. assessment
No