Telecommunication Mast Woods Yard Rear Of 17 Woodnesborough Road Sandwich Kent Data via plota.co.uk

26/00644 - Circ 34/76 O/Head Lines/28 Day Notificat Awaiting decision

Proposal

Regulation 5 (The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) to install a generator, a power duct, PSU cabinet, cable trunking, AMF panel to be installed on new support pole, (Existing earth pit to be removed and relocated) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2026
Decision
Expected by 30 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 28 Nov 2026 and 20 Dec 2026, from Dover's recent utility and infrastructure works.

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 477 m away: Richborough Connection Project
The site is 477 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Sea Link (awaiting the Secretary of State's decision, 1602 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Scheduled monument 164 m away: Sandwich town walls: section from Woodnesborough Gate to Canterbury Gate; Coalfield, development low risk area; Conservation area 74 m away: Sandwich - Walled Town; Inside the Sandwich built-up area.
Not affected
Not green belt · No listed building at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Circ 34/76 O/Head Lines/28 Day Notificat
Received
3 Nov 2026
Validated
3 Nov 2026
Ward
Sandwich
Parish
SANDWICH
Case officer
Show
Target decision
30 Nov 2026
Applicant
Show

Decision outlook

Day 15 of the 56-day target. Dover usually decides utility and infrastructure works by day 27.

Day 1541 days to the 56-day target
86%decided within 8 weeks
96%approved
50decided in the last year

Plota live figures for utility and infrastructure works decided by Dover in the last twelve months, from validation. Dover decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
30 Nov 2026
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 councils
Relevant to this application:
Householder decisions

Dover is one of the fastest councils in England for householder decisions, ranking #28 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026