Land Between Little Hale Fen Solar Scheme And Bicker Fen Substation Boston Lincolnshire Data via plota.co.uk

26/0068/OHL - Overhead Electricity Lines Decided

Proposal

Application pursuant to Section 37 of the Electricity Act 1989 (Section 37) for consent to construct three sections of overhead power lines which will form part of the grid connection from the approved Little Hale Fen solar scheme to National Grids Bicker Fen substation off Vicarage Drove, Boston Lincolnshire Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Jan 2026
✓
Consultation
25 Feb 2026
Decision
Target date was 26 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 312.

The consultation period closed on 25 Feb 2026.

Documents 21

All documents on the council site ↗

Site constraints 1

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Kesteven - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Overhead Electricity Lines
Received
15 Jan 2026
Validated
15 Jan 2026
Ward
Helpringham And Osbournby
Parish
Little Hale
Case officer
Show
Target decision
26 Feb 2026
Decision level
Delegated Decision
Applicant
Show

Decision outlook

Day 312, past the statutory target. 82% of utility and infrastructure works in North Kesteven are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 19 Nov 2026.

Day 312256 days past the 56-day target
67%decided within 8 weeks
100%approved
37decided in the last year

Plota live figures for utility and infrastructure works decided by North Kesteven in the last twelve months, from validation. North Kesteven decision record →

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
25 Feb 2026
Comments by
25 Feb 2026
Statutory expiry
26 Feb 2026
Env. assessment
No
North Kesteven
Planning Authority Score
6.5/10
Good
#79 of 296 overall
Relevant to this application:
Householder decisions

North Kesteven is #117 of 296 councils on householder decision speed. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

More permissive than most councils
99% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Kesteven decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #4 of 296
99%
Householder approved
Above avg (90%) #6 of 296
71%
Decided in 8 weeks
Above avg (63%) #117 of 296
45%
Extended time limit
Above avg (41%) #193 of 296
90%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
9 decided (10+ homes)
97%
Change of use approved
36 decided
631
Total decisions
19 refused in the year to March 2026