Polyframe Storage Land Unit 9 Atlas Works Norwich Road Weston Longville Norfolk Data via plota.co.uk

2026/3476 - Full Pending Consideration

Proposal

Erection of lightweight storage structure on existing hardstanding (no foundations) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Nov 2026
✓
Consultation
20 Nov 2026
Decision
Expected by 12 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 19 Jan 2027 and 9 Feb 2027, from South Norfolk Broadland's recent commercial and major works.

Comments are open until 11 Dec 2026

Comment on this application ↗

Site constraints 6

Nutrient neutrality catchment: River Wensum SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special area of conservation 231 m away: River Wensum
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
National infrastructure project 861 m away: Hornsea Project Three Offshore Wind Farm
The site is 861 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Sheringham and Dudgeon Extension Projects (decided, 1.3 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI 231 m away: River Wensum SSSI; Inside the Morton (Broadland) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Norfolk Broadland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Received
17 Nov 2026
Validated
17 Nov 2026
Ward
Great Witchingham
Parish
Morton On The Hill
Case officer
Show
Target decision
12 Jan 2027
Decision level
Schedule 2
Applicant
Show
Agent
RE Design Architects Limited

Decision outlook

Day 6 of the 56-day target. South Norfolk Broadland usually decides commercial and major works by day 74.

Day 668 days to the predicted decision (day 74)
32%decided within 8 weeks
90%approved
6%go to committee

Plota live figures for commercial and major works decided by South Norfolk Broadland in the last twelve months, from validation. South Norfolk Broadland decision record →

Public comments

No public comments yet.

25 neighbours consulted · Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PLP-00025907
Neighbours
20 Nov 2026
Consultation
20 Nov 2026
Comments by
11 Dec 2026
Statutory expiry
12 Jan 2027
Env. assessment
No
South Norfolk Broadland
Planning Authority Score
5.9/10
Average
#106 of 296 overall
Relevant to this application:
Householder decisions

South Norfolk Broadland is #136 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Norfolk Broadland decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #50 of 296
95%
Householder approved
Above avg (90%) #71 of 296
67%
Decided in 8 weeks
Above avg (63%) #136 of 296
42%
Extended time limit
Above avg (41%) #161 of 296
82%
Minor dwellings approved
137 decided (1-9 homes)
92%
Major dwellings approved
12 decided (10+ homes)
100%
Change of use approved
33 decided
1,013
Total decisions
67 refused in the year to March 2026