Jackies Riding School, Y Waunydd, Factory Road, Pembrey, Burry Port, SA16 0DZ Data via plota.co.uk

PL/11428 - Full planning permission Under Consultation

Proposal

The installation of a replacement 22.5m monopole with headframe accommodating 3 no replacement antenna, and ancillary radio equipment and 1 no. 0.3m and 1 no. 0.6m transmission dishes and a new equipment cabin within the existing compound along with ancillary development thereto Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Sept 2026
✓
Validated
18 Sept 2026
Decision
Expected by 13 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 16 Nov 2026 and 9 Dec 2026, from Carmarthenshire's recent full applications.

Comments are open until 12 Oct 2026

Comment on this application ↗

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project: Gwynt Glas Offshore Wind Farm, at pre-application; Coalfield, development low risk area.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA16 0DZ
Received
16 Sept 2026
Validated
18 Sept 2026
Ward
Pembrey
Parish
Pembrey and Burry Port Town
Case officer
Show
Target decision
13 Nov 2026

Decision outlook

Day 21 of the 56-day target. Carmarthenshire usually decides full applications by day 70.

Day 2149 days to the predicted decision (day 70)
38%decided within 8 weeks
78%approved
234decided in the last year

Plota live figures for full applications decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
12 Oct 2026