33 Cavendish Square London W1G 0PS Data via plota.co.uk

25/05480/FULL - Full Planning Permission Application Approved

Proposal

Deep retrofit and extension of the existing building and replacement of facade and facade works, deepened basement, and the demolition of part of the existing building to provide a mixed use building comprising: offices (Class E(g)(i)); retail (Class E(a)); flexible retail, restaurant, cafe, leisure and entertainment (Class E(a) and/or Class E(b) and/or Class E(d) and/or sui generis food hall and/or sui generis composite use, comprising competitive socialising including bar use with an extended food and drink offer); flexible cultural and creative floorspace (sui generis composite use, comprising Class F1 and/or Class E(a) and/or Class E (g)(i-iii)); flexible office, retail and destination floorspace (Class E(a) and/or Class E (b) and/or (d) and/or Class E(g)(i) and/or sui generis composite use, comprising visitor destination floorspace viewing gallery with extended food and beverage, bar and leisure offer), replacement public house (sui generis), together with terraces, green roofs, solar voltaic panels and associated works as part of a phased development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Aug 2025
✓
Consultation
19 Aug 2025
✓
Approved
27 Mar 2026

Approved on 27 Mar 2026 · Delegated Decision · Last checked 31 Oct 2026

Documents 205

Statements & assessments 48

PDF LEAD LOCAL FLOOD AUTHORITY COMMENT Other · 28 Aug 2025 View ↗ PDF TOWN PLANNING STATEMENT Background Papers · 22 Aug 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 1 Background Papers · 15 Aug 2025 View ↗ PDF VENTILATION AND EXTRACTION STATEMENT Background Papers · 15 Aug 2025 View ↗ PDF AIR QUALITY ASSESSMENT Air quality assessment · 5 Aug 2025 View ↗ PDF ARCHAEOLOGICAL IMPACT ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF CONTAMINATED LAND ASSESSMENT PART 1 Background Papers · 5 Aug 2025 View ↗ PDF CONTAMINATED LAND ASSESSMENT PART 2 Background Papers · 5 Aug 2025 View ↗ PDF CRIME IMPACT ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF DAYLIGHT SUNLIGHT AND OVERSHADOWING ASSESSMENT APPENDICES Daylight and Sunlight assessment · 5 Aug 2025 View ↗ PDF DAYLIGHT SUNLIGHT AND OVERSHADOWING ASSESSMENT Daylight and Sunlight assessment · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 1 - INTRODUCTION Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 2 - CONTEXT AND ANALYSIS Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 3 - EXISTING BUILDING Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 4 - DESIGN BRIEF LAND USE AND MASSING Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 5 - PART 1 - THE PROPOSAL Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 5 - PART 2 - THE PROPOSAL Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 5 - PART 3 - THE PROPOSAL Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 5 - PART 4 - THE PROPOSAL Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 5 - PART 5 - THE PROPOSAL Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 6 - ACCESS AND INCLUSIVE DESIGN Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 7 - APPENDIX Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 7.3- APPENDIX - HUMAN-CENTRIC DESIGN STRAT Design and Access Statement · 5 Aug 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT - CHAPTER 7.4 - APPENDIX - CULTURAL PLACESHAPING STR Design and Access Statement · 5 Aug 2025 View ↗ PDF ENERGY STRATEGY Energy Assessment · 5 Aug 2025 View ↗ PDF ECONOMIC STATEMENT Background Papers · 5 Aug 2025 View ↗ PDF FLOOD RISK ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF FOUL SEWAGE ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF HEALTHY STREETS TRANSPORT ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF LIGHTING ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF NOISE IMPACT ASSESSMENT Noise impact assessment · 5 Aug 2025 View ↗ PDF FIRE STATEMENT Background Papers · 5 Aug 2025 View ↗
PDF Commenter’s name hidden Show Statement of Community Involvement · 5 Aug 2025 View ↗
PDF STRUCTURAL METHODOLOGY STATEMENT Background Papers · 5 Aug 2025 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Background Papers · 5 Aug 2025 View ↗ PDF SUSTAINABLE DRAINAGE DESIGN STRATEGY Background Papers · 5 Aug 2025 View ↗ PDF TOWN PLANNING STATEMENT Planning Statement · 5 Aug 2025 View ↗ PDF TOWNSCAPE VISUAL AND BUILT HERITAGE ASSESSMENT PART 1 OF 3 Heritage Statement · 5 Aug 2025 View ↗ PDF TOWNSCAPE VISUAL AND BUILT HERITAGE ASSESSMENT PART 2 OF 3 Heritage Statement · 5 Aug 2025 View ↗ PDF TOWNSCAPE VISUAL AND BUILT HERITAGE ASSESSMENT PART 3 OF 3 Heritage Statement · 5 Aug 2025 View ↗ PDF SOCIAL VALUE STATEMENT Background Papers · 5 Aug 2025 View ↗ PDF UTILITIES STATEMENT Background Papers · 5 Aug 2025 View ↗ PDF WIND AND MICROCLIMATE ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF BNG STATUTORY METRIC Background Papers · 5 Aug 2025 View ↗ PDF ECOLOGICAL APPRAISAL Background Papers · 5 Aug 2025 View ↗ PDF ECOLOGICAL BREEAM APPRAISAL Background Papers · 5 Aug 2025 View ↗ PDF WHOLE LIFE CYCLE ASSESSMENT Background Papers · 5 Aug 2025 View ↗ PDF CIRCULAR ECONOMY STATEMENT - PART 2 Background Papers · 5 Aug 2025 View ↗

Plans & drawings 114

PDF EXISTING PLAN LEVEL 00 Drawing · 19 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 11 Drawing · 19 Aug 2025 View ↗ PDF EXISTING SECTION 1 - NORTH SOUTH Drawing · 19 Aug 2025 View ↗ PDF EXISTING SECTION 2 - EAST WEST Drawing · 19 Aug 2025 View ↗ PDF EXISTING SITE PLAN Drawing · 19 Aug 2025 View ↗ PDF INDICATIVE PHASING PLAN Drawing · 19 Aug 2025 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 19 Aug 2025 View ↗ PDF PROPOSED NORTH AND WEST ELEVATION Drawing · 19 Aug 2025 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 19 Aug 2025 View ↗ PDF PROPOSED SOUTH AND EAST ELEVATION Drawing · 19 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 2 - TYPICAL ATTICS Drawing · 19 Aug 2025 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 19 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 01. RETAINED TOWER LEVEL 01 Drawing · 19 Aug 2025 View ↗ PDF PROPOSED. PLAN LEVEL 00 Drawing · 19 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 16 Drawing · 19 Aug 2025 View ↗ PDF EXISTING SITE PLAN Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SITE PLAN Drawing · 5 Aug 2025 View ↗ PDF SITE LOCATION PLAN Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 00 MEZZANINE Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 00 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 01 MEZZANINE Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 01 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 02 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 03 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 04 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 05 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 06 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 07 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 08 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 09 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 10 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 11 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 12 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 13 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 14 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 15 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 16 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 17 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 18 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 19 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 20 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL 21 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL B1 Drawing · 5 Aug 2025 View ↗ PDF EXISTING PLAN LEVEL ROOF Drawing · 5 Aug 2025 View ↗ PDF EXISTING EAST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING NORTH AND WEST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING NORTH ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING SOUTH AND EAST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING SOUTH BAR NORTH AND TOWER SOUTH ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING SOUTH ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING WEST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF EXISTING SECTION 1 - NORTH SOUTH Drawing · 5 Aug 2025 View ↗ PDF EXISTING SECTION 2 - EAST WEST Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 01. RETAINED TOWER LEVEL 01 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 02. RETAINED TOWER LEVEL 02 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 03. RETAINED TOWER LEVEL 04 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 04. RETAINED TOWER LEVEL 05 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 05. RETAINED TOWER LEVEL 06 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 07 RETAINED TOWER LEVEL 09 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 08 RETAINED TOWER LEVEL 10 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 00 MEZZANINE Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 03 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 07 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 11 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 12 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 13 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 14 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 15 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 16 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 17 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 18 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 19 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 20 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL 21 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED. RETAINED TOWER LEVEL ROOF Drawing · 5 Aug 2025 View ↗ PDF PROPOSED EAST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED NORTH AND WEST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED NORTH ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SOUTH AND EAST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SOUTH ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WEST ELEVATION Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SECTION 1 - NORTH SOUTH Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SECTION 2 - NORTH SOUTH Drawing · 5 Aug 2025 View ↗ PDF PROPOSED SECTION 3 - EAST WEST Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 1 - TYPICAL PODIUM 1 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 1 - TYPICAL PODIUM 2 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 2 - TYPICAL ATTICS Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 3 - TYPICAL TOWER Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 4 - TYPICAL CROWN Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 5 - TYPICAL TOWER ENDS Drawing · 5 Aug 2025 View ↗ PDF PROPOSED WALL TYPE 6 - TYPICAL AUDITORIUM Drawing · 5 Aug 2025 View ↗ PDF PROPOSED PLAN LEVEL 00 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED PLAN LEVEL B1 Drawing · 5 Aug 2025 View ↗ PDF PROPOSED PLAN LEVEL B2 Drawing · 5 Aug 2025 View ↗ PDF DELIVERY AND SERVICING MANAGEMENT PLAN Background Papers · 5 Aug 2025 View ↗ PDF OUTLINE CONSTRUCTION LOGISTICS PLAN Background Papers · 5 Aug 2025 View ↗ PDF DRAFT EMPLOYMENT AND SKILLS PLAN Background Papers · 5 Aug 2025 View ↗ PDF FRAMEWORK TRAVEL PLAN Travel Plan · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - GROUND FLOOR PLAN - LEVEL 00 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - OVERALL ROOF PLAN - RETAINED TOWER LEVEL ROOF Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - OVERALL UGF Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - NEW BUILD LEVEL 01 - RETAINED TOWER LEVEL 0 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - NEW BUILD LEVEL 02 - RETAINED TOWER LEVEL 0 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - NEW BUILD LEVEL 05 - RETAINED TOWER LEVEL 0 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - NEW BUILD LEVEL 06 - RETAINED TOWER LEVEL 0 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - NEW BUILD LEVEL 08 - RETAINED TOWER LEVEL 1 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL 07 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL 11 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL 16 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL 18 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL 20 Drawing · 5 Aug 2025 View ↗ PDF LANDSCAPING DRAWING - TERRACE PLAN - RETAINED TOWER LEVEL ROOF Drawing · 5 Aug 2025 View ↗ PDF DRAWING REGISTER Background Papers · 5 Aug 2025 View ↗ PDF INDICATIVE PHASING PLAN Drawing · 5 Aug 2025 View ↗

Other documents 28

PDF 33 CAVENDISH SQ S106 ENGROSSMENT DATED 27 MARCH 2026 Legal Agreement · 27 Mar 2026 View ↗ PDF ENGROSSMENT VERSION OF S106 Background Papers · 17 Mar 2026 View ↗ PDF DRAFT S106 AGREEMENT Legal Agreement · 18 Feb 2026 View ↗ PDF EMAIL DATED Incoming Correspondence · 18 Feb 2026 View ↗ PDF Other Other · 30 Oct 2025 View ↗ PDF DESIGN REVIEW PANEL REPORT Background Papers · 28 Oct 2025 View ↗ PDF 33 CAVENDISH SQUARE - STAGE 1 REPORT - FINAL Background Papers · 30 Sept 2025 View ↗ PDF ACK-GENERAL LETTER (G/P/C) Background Papers · 19 Aug 2025 View ↗ PDF CNSLT-LA SOCIETY Background Papers · 19 Aug 2025 View ↗ PDF CNSLT-WARD COUNCILLORS Background Papers · 19 Aug 2025 View ↗ PDF CNSLT-WARD COUNCILLORS Background Papers · 19 Aug 2025 View ↗ PDF CNSLT-WARD COUNCILLORS Background Papers · 19 Aug 2025 View ↗ PDF CNSLT-MET POLICE HQ-VERY LARGE SCHEMES Background Papers · 19 Aug 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 19 Aug 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 19 Aug 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 19 Aug 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 19 Aug 2025 View ↗ PDF ECNSLT-INTERNAL CONSULTS Background Papers · 19 Aug 2025 View ↗ PDF SITE NOTICE 21 OR 28 DAYS IF T&C APPL. Background Papers · 19 Aug 2025 View ↗ PDF 33 CAVENDISH SQUARE PPA ISSUED Background Papers · 19 Aug 2025 View ↗ PDF PROPOSED. NEW BUILD LEVEL 06 RETAINED TOWER LEVEL 08 Background Papers · 15 Aug 2025 View ↗ PDF ATTACHMENT SUMMARY Background Papers · 5 Aug 2025 View ↗ PDF APPLICANT COVER LETTER Background Papers · 5 Aug 2025 View ↗ PDF CODE OF CONSTRUCTION APPENDIX A COMBINED Background Papers · 5 Aug 2025 View ↗ PDF BE SEEN EMISSIONS REDUCTION SPREADSHEET Background Papers · 5 Aug 2025 View ↗ PDF LANDSCAPE AND PUBLIC REALM STRATEGY Background Papers · 5 Aug 2025 View ↗ PDF WHOLE LIFE CARBON GLA SPREADSHEET Background Papers Sensitive · 5 Aug 2025 View ↗ PDF CIRCULAR ECONOMY GLA SPREADSHEET Background Papers · 5 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 11

2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
23 listed buildings within 150 m
Nearest: 1 and 1a, Cavendish Square W1, Grade II, 30 m away · 4 Grade II*, 19 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 23 with distances
Historic England ↗
Conservation area 17 m away: Harley Street
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National infrastructure project 1447 m away: Thames Tideway Tunnel; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Priority habitat 43 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area4,038 m² (43,465 sq ft)
Energy ratingD (asset rating 87)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in November 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W1G 0PS
Received
5 Aug 2025
Validated
5 Aug 2025
Ward
West End
Case officer
Show
Target decision
30 Mar 2026
Decision
Application Permitted
Decision date
27 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Newmark

How this decision compares

Decided in 234 days from validation, 158 days slower than Westminster's median of 76 for full applications. Approved, as 86% of full applications here are.

35%decided within 8 weeks
86%approved
2,198decided in the last year

Plota live figures for full applications decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

7comments received
4 objecting2 neutral1 supporting

57% object · below the UK average of 74%

265 neighbours consulted · Last counted 31 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13983764
Planning Portal ref
PP-13983764
Comments by
17 Sept 2025
Site or press notice
19 Aug 2025
Committee
9 Dec 2025
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.