Land adjacent Rothbury Road & East Cross Route, Tower Hamlets, E9 Data via plota.co.uk

PA/25/01224/NC - Advertisement Consent Approved

Proposal

Display of 2no. free-standing landscape digital display units (12m by 3m). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 8 Jul 2025
✓
Consultation
22 Jul 2025
✓
Approved
3 Oct 2025
✓
Appeal allowed

Approved on 3 Oct 2025 · Delegated · Last checked 22 Nov 2026

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 3.2
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; National infrastructure project about 1.6 km away: Thames Tideway Tunnel; Registered park or garden about 202 m away: Victoria Park; Conservation area about 83 m away: Fish Island; Inside the Tower Hamlets built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Received
around 8 Jul 2025
Validated
8 Jul 2025
Ward
Bow East
Case officer
Show
Target decision
3 Oct 2025
Decision
Permit
Decision date
3 Oct 2025
Decision level
Delegated
Applicant
Show
Agent
Wildstone

How this decision compares

Decided in 87 days from validation, 31 days slower than Tower Hamlets's median of 56 for advertisement consent. Approved, as 86% of advertisement consent here are.

65%decided within 8 weeks
86%approved
111decided in the last year

Plota live figures for advertisement consent decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
22 Jul 2025
Consultation
22 Jul 2025
Comments by
23 Sept 2025
Site or press notice
1 Sept 2025
Statutory expiry
3 Sept 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 overall
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications: #207 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026