Angel House, Sycamore Street, Newcastle Emlyn, SA38 9AJ Data via plota.co.uk

PL/10009 - Full planning permission In Review

Proposal

Change of use from A1 (shop) to C3 (dwelling) with rear extension and alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Oct 2025
✓
Validated
10 Oct 2025
Decision
Target date was 20 Nov 2026
Appeal
Appeal lodged

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 29 Apr 2026; it is now day 409.

The consultation period closed on 29 Apr 2026.

Site constraints 7

Grade II listed: Angel House (J.David Lewis Premises)
List entry 9711 · 6 m away · 19 more listed buildings within 150 m (1 Grade II*, 18 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 19 with distances
Cadw ↗
Nutrient neutrality catchment: Afon Teifi
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Newcastle Emlyn conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Special area of conservation 42 m away: Afon Teifi / River Teifi
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 42 m away: Afon Teifi
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Scheduled monument 155 m away: Newcastle Emlyn Castle
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Not affected
Outside flood zones 2 and 3

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
SA38 9AJ
Received
8 Oct 2025
Validated
10 Oct 2025
Ward
Cenarth and Llangeler
Parish
Newcastle Emlyn
Case officer
Show
Target decision
20 Nov 2026

Decision outlook

Day 409, past the statutory target. 61% of full applications in Carmarthenshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 409353 days past the 56-day target
35%decided within 8 weeks
78%approved
394decided in the last year

Plota live figures for full applications decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
29 Apr 2026