Charlwood House Charlwood Lane Monkwood Alresford Hampshire SO24 0HA Data via plota.co.uk

SDNP/26/03769/HOUS - Householder Application in Progress

Proposal

Demolition, alteration and extension works to provide a ground floor bedroom and reconfigured kitchen, boot room and utility space. Installation of a new external side porch Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2026
✓
Validated
12 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 7 Jan 2027 and 17 Jan 2027, from South Downs's recent demolitions.

Site constraints 4

South Downs National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 886 m away: Southampton to London Pipeline Project
The site is 886 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £2,200,000 in June 2026. Other property, freehold.

25 June 2026£2,200,000Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area50 m² (538 sq ft)
Energy ratingD (67 out of 100)
PropertyDetached maisonette, 2 habitable rooms
Built2003 to 2006
HeatingBoiler and radiators, oil
WallsTimber frame, as built, insulated (assumed)

From the energy performance certificate lodged in November 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in South Downs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder
Postcode
SO24 0HA
Received
30 Sept 2026
Validated
12 Nov 2026
Ward
Ropley, Hawkley & Hangers Ward
Parish
Ropley Parish Council
Case officer
Show
Target decision
7 Jan 2027
Decision level
SDNPA Delegated Decision
Applicant
Show
Agent
Studio Fothergill

Decision outlook

Day 11 of the 56-day target. South Downs usually decides demolitions by day 62.

Day 1151 days to the predicted decision (day 62)
45%decided within 8 weeks
90%approved
133decided in the last year

Plota live figures for demolitions decided by South Downs in the last twelve months, from validation. South Downs decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15251309
Planning Portal ref
PP-15251309
Statutory expiry
7 Jan 2027
Env. assessment
No

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.