Gatton Manor Hotel and Country Club, Standon Lane, Ockley, Dorking, Surrey, RH5 5PQ Data via plota.co.uk

MO/2025/1061 - Detailed Major Approved at committee

Approved at planning committee on 29 April 2026, subject to a legal agreement. The council issues its decision notice once the agreement is signed.

Proposal

Demolition of existing buildings and redevelopment to provide green and blue infrastructure including new hotel accommodation with lodges, health club and spa with indoor pool (Class C1) together with associated infrastructure (sub-stations, ancillary generator, foul drainage facility, access roads and parking), tennis and padel tennis courts, landscaping and refurbishment of existing swimming lake and provision of Biodiversity Net Gain. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Jun 2025
✓
Validated
19 Jun 2025
✓
Committee
29 Apr 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 30 Mar 2026; it is now day 523.

The consultation period closed on 30 Mar 2026.

Planning committee

Decided by Mole Valley Development Management Committee on 29 Apr 2026. The council has not yet issued its decision notice.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • The committee granted permission, subject to the completion of a Section 106 agreement.
  • Condition 16 was amended as part of the decision.
  • An informative was added asking for fireworks to be used considerately.

Source: Plota analysis of Mole Valley's committee minutes, Mole Valley Development Management Committee minutes, 29 April 2026 .

Site constraints 4

Ancient woodland
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Public footpath 23 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Ancient woodlandCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,304 m² (24,800 sq ft)
Energy ratingE (asset rating 108)
UseC1 Hotels
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2017, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Mole Valley - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Detailed Major
Postcode
RH5 5PQ
Received
18 Jun 2025
Validated
19 Jun 2025
Ward
Mickleham, Westcott and Okewood
Parish
Abinger
Case officer
Show
Target decision
25 Sept 2025
Decision level
Planning Committee
Applicant
Show
Agent
Carter Jonas

Decision outlook

Day 523, past the statutory target. 52% of full applications in Mole Valley are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 523467 days past the 56-day target
14%decided within 8 weeks
65%approved
11%go to committee

Plota live figures for full applications decided by Mole Valley in the last twelve months, from validation. Mole Valley decision record →

Public comments

1comment received

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13999137
Comments by
30 Mar 2026
Committee
29 Apr 2026
Statutory expiry
30 Sept 2026
Env. assessment
No
Mole Valley
Planning Authority Score
2.1/10
Poor
#270 of 296 overall
Relevant to this application:
Major dwellings

Mole Valley is slower than most councils at deciding householder applications: #240 of 296 on speed. Mole Valley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

One of the strictest councils
only 76% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Mole Valley decision statistics
Based on MHCLG data, the year to March 2026
72%
Overall approval rate
Below avg (87%) #291 of 296
76%
Householder approved
Below avg (90%) #291 of 296
50%
Decided in 8 weeks
Below avg (63%) #240 of 296
43%
Extended time limit
Above avg (41%) #172 of 296
47%
Minor dwellings approved
114 decided (1-9 homes)
71%
Major dwellings approved
7 decided (10+ homes)
93%
Change of use approved
15 decided
913
Total decisions
259 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.