Land Opposite The Laurels Wanswell Berkeley Gloucestershire Data via plota.co.uk

S.25/2318/FUL - Full Planning Application Approved

Proposal

Erection of a self-build dwellinghouse (Class C3). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Dec 2025
✓
Approved
18 Aug 2026

Approved on 18 Aug 2026 · Delegated Decision · Last checked 3 Oct 2026

Associated applications 2

Site constraints 6

Habitat network: Traditional orchards
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
2 listed buildings within 150 m
Nearest: Barn Immediately West of the Vines, Grade II, 39 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Also on the record
Inside the Brookend built-up area; Priority habitat 9 m away: Traditional orchard; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stroud - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Stroud
Application type
Full Planning Application
Received
3 Dec 2025
Validated
3 Dec 2025
Ward
Berkeley Vale Ward
Parish
Hamfallow Parish Council
Case officer
Show
Target decision
28 Jan 2026
Decision
Permission
Decision date
18 Aug 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 258 days from validation, 192 days slower than Stroud's median of 66 for full applications. Approved, as 83% of full applications here are.

41%decided within 8 weeks
83%approved
264decided in the last year

Plota live figures for full applications decided by Stroud in the last twelve months, from validation. Stroud decision record →

Public comments

No public comments yet.

1 neighbour consulted · Last counted 3 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
30 Apr 2026
Env. assessment
No
Stroud
Planning Authority Score
5.4/10
Average
#126 of 296 overall
Relevant to this application:
Householder decisions

Stroud is #98 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Stroud decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #181 of 296
92%
Householder approved
Above avg (90%) #166 of 296
73%
Decided in 8 weeks
Above avg (63%) #98 of 296
39%
Extended time limit
Below avg (41%) #144 of 296
63%
Minor dwellings approved
64 decided (1-9 homes)
70%
Major dwellings approved
10 decided (10+ homes)
83%
Change of use approved
54 decided
964
Total decisions
121 refused in the year to March 2026