Land Adjacent To 1 Long Bank Birtley DH3 1PX Data via plota.co.uk

DC/25/00556/FUL - Full Application Approved

Proposal

Proposed detached 2 storey 3 bedroom dwelling (amended plans received 10.09.25, 30.09.25, 04.11.25 and 29.04.26) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Jul 2025
✓
Validated
31 Jul 2025
✓
Approved
29 May 2026

Approved on 29 May 2026 · Delegated Decision · Last checked 14 Oct 2026

Associated applications 2

Site constraints 6

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
National infrastructure project about 117 m away: A1 Birtley to Coal House Improvement Scheme
The site is about 117 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument about 78 m away: Bowes Railway
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Heritage at risk about 78 m away: Bowes Railway, track, wagon shop, hauler houses and associated sheds, structures and incline, Bowes Railway; Inside the Birtley built-up area; Green belt about 91 m away: Tyne and Wear.
Not affected
Outside flood zones 2 and 3

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gateshead - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gateshead
Application type
Full Application
Postcode
DH3 1PX
Received
10 Jul 2025
Validated
31 Jul 2025
Ward
Lamesley
Parish
Lamesley Parish Council
Case officer
Show
Target decision
29 May 2026
Decision
Grant
Decision date
29 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Aspect Design

How this decision compares

Decided in 302 days from validation, 201 days slower than Gateshead's median of 101 for full applications. Approved, as 81% of full applications here are.

23%decided within 8 weeks
81%approved
13%go to committee

Plota live figures for full applications decided by Gateshead in the last twelve months, from validation. Gateshead decision record →

Public comments

4comments received
3 objecting1 neutral

75% object · above the UK average of 74%

18 neighbours consulted · Last counted 14 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
21 May 2026
Statutory expiry
29 May 2026
Env. assessment
No
Gateshead
Planning Authority Score
2.4/10
Poor
#255 of 296 overall
Relevant to this application:
Householder decisions

Gateshead is one of the slowest councils in England for householder decisions: #289 of 296 on speed. The council extends the time limit on 67% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Gateshead decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #130 of 296
94%
Householder approved
Above avg (90%) #107 of 296
26%
Decided in 8 weeks
Below avg (63%) #289 of 296
67%
Extended time limit
Above avg (41%) #282 of 296
58%
Minor dwellings approved
24 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
70%
Change of use approved
37 decided
482
Total decisions
54 refused in the year to March 2026