S/O 18 Plantation Close Askern Doncaster Data via plota.co.uk

25/02410/PDTEL - PD Telecommunications Decided

Proposal

Notification to utilise permitted development rights in accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) - Installation of 9m Light wooded pole - OGEAA2606420 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Dec 2025
Decision
Target date was 5 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 350.

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 350 m away: Fenwick Solar Farm
The site is 350 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Knottingley Power Project (decided, 496 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Askern built-up area; Green belt 27 m away: South and West Yorkshire.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Doncaster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Doncaster
Application type
PD Telecommunications
Received
8 Dec 2025
Validated
8 Dec 2025
Ward
Norton And Askern
Parish
Askern Town Council
Case officer
Show
Target decision
5 Jan 2026
Applicant
Show
Agent
Sireesha Mamidala - Openreach

Decision outlook

Day 350, past the statutory target. 97% of prior approvals in Doncaster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 350294 days past the 56-day target
94%decided within 8 weeks
88%approved
166decided in the last year

Plota live figures for prior approvals decided by Doncaster in the last twelve months, from validation. Doncaster decision record →

Public comments

No public comments yet.

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
5 Jan 2026
Env. assessment
No
Doncaster
Planning Authority Score
7.7/10
Good
#36 of 296 overall
Relevant to this application:
Householder decisions

Doncaster is one of the fastest councils in England for householder decisions: #27 of 296 on speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Doncaster decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #169 of 296
94%
Householder approved
Above avg (90%) #103 of 296
83%
Decided in 8 weeks
Above avg (63%) #27 of 296
33%
Extended time limit
Below avg (41%) #75 of 296
67%
Minor dwellings approved
135 decided (1-9 homes)
93%
Major dwellings approved
27 decided (10+ homes)
90%
Change of use approved
48 decided
928
Total decisions
122 refused in the year to March 2026