Long Itchington Wood Tunnel Leamington Road Southam Data via plota.co.uk

HS2BIU/00067/26 - HS2 - Bringing into Use Approved

Proposal

Request for approval of Bringing Into Use under Schedule 17 Paragraph 9(1) for Scheduled work no. 2/147 - realignment of the A425 Leamington Road commencing at a point 360 metres east of its junction with the access to Lower Farm and terminating at a point 372 metres west of its commencement. Work no. 2/147 includes a bridge over Work no. 2/146. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
21 Sept 2026
✓
Approved
20 Nov 2026

Approved on 20 Nov 2026 · Last checked 21 Nov 2026

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Public footpath 26 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Radon affected area, class 2; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Stratford on Avon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
HS2 - Bringing into Use
Received
21 Sept 2026
Validated
21 Sept 2026
Ward
Southam North & Long Itchington
Parish
Long Itchington
Case officer
Show
Target decision
20 Nov 2026
Decision date
20 Nov 2026
Applicant
Show

How this decision compares

Decided in 60 days from validation, 25 days faster than Stratford on Avon's median of 85 for commercial and major works. Approved, as 89% of commercial and major works here are.

32%decided within 8 weeks
89%approved
72decided in the last year

Plota live figures for commercial and major works decided by Stratford on Avon in the last twelve months, from validation. Stratford on Avon decision record →

Consultation & key dates

Consultation
12 Oct 2026
Comments by
2 Nov 2026
Stratford on Avon
Planning Authority Score
5.5/10
Average
#121 of 296 overall
Relevant to this application:
Householder decisions

Stratford on Avon is #142 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Stratford on Avon decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #94 of 296
95%
Householder approved
Above avg (90%) #93 of 296
67%
Decided in 8 weeks
Above avg (63%) #142 of 296
42%
Extended time limit
Above avg (41%) #166 of 296
82%
Minor dwellings approved
146 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
87%
Change of use approved
53 decided
1,257
Total decisions
98 refused in the year to March 2026