Bottom Plain Solar Park Bere Road Coldharbour Data via plota.co.uk

P/VOC/2026/05947 - Variation of Condition Out To Consultation

Proposal

Construction of a solar park including ground mounted solar voltaic arrays, operating up to 10 MW of electricity, together with ancillary plant equipment, component housing, security fencing, cameras, landscaping and other associated works (with variation of condition 10 to allow continued use for an additional 10 years) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Dec 2026 and 15 Dec 2026, from Dorset's recent amendments.

The consultation period closed on 20 Nov 2026.

Site constraints 7

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 154 m away: Dorset Heaths
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 154 m away: Morden Bog and Hyde Heath SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Nature improvement area: Wild Purbeck.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Variation of Condition
Received
23 Oct 2026
Validated
23 Oct 2026
Ward
Wareham Ward
Parish
Wareham St. Martin
Case officer
Show
Applicant
Show
Agent
Thomas Russell

Decision outlook

Day 31 of the 56-day target. Dorset usually decides amendments by day 48.

Day 3125 days to the 56-day target
70%decided within 8 weeks
89%approved
482decided in the last year

Plota live figures for amendments decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
20 Nov 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 overall
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications: #51 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026