The Quadrangle, Morden College, 19 St Germans Place, London, SE3 0PW Data via plota.co.uk

26/2549/L - Listed Building Consent Registered

Proposal

Repairs, refurbishment and alteration of the Quadrangle, including repairs and replacement of roofing, brickwork, guttering, doors, windows, decorative banding and rendered sills; installation of mechanical and electrical services, internal insulation and fire inlets; internal reconfiguration of the residential accommodation including a reduction in the number of units; landscaping works within the Quadrangle courtyard; installation of rooftop solar photovoltaic panels on Cullum Welch Court; and associated internal and external works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Aug 2026
✓
Validated
11 Sept 2026
✓
Consultation
24 Sept 2026
Decision
Expected by 6 Nov 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 6 Nov 2026 and 13 Nov 2026, from Greenwich's recent listed building works. Comments are open until 14 Oct 2026.

Comment on this application ↗

Documents 60

Plans & drawings 21

PDF Drawing & document issue sheet Document · 14 Sept 2026 View ↗ PDF 0000 series Existing floor plans Drawing · 14 Sept 2026 View ↗ PDF 0100 series Existing sections Drawing · 14 Sept 2026 View ↗ PDF 0200 series Existing elevations Drawing · 14 Sept 2026 View ↗ PDF 0400 series Existing reflected ceiling plans Drawing · 14 Sept 2026 View ↗ PDF 1000 series Dismantling plans Drawing · 14 Sept 2026 View ↗ PDF 1100 series Dismantling sections Drawing · 14 Sept 2026 View ↗ PDF 1200 series Dismantling elevations Drawing · 14 Sept 2026 View ↗ PDF 1400 series Existing reflected ceiling dismantling plans Drawing · 14 Sept 2026 View ↗ PDF 2000 series Proposed plans Drawing · 14 Sept 2026 View ↗ PDF 2100 series Proposed sections Drawing · 14 Sept 2026 View ↗ PDF 2200 series Proposed elevations Drawing · 14 Sept 2026 View ↗ PDF 2300 series Proposed typical internal arrangements Drawing · 14 Sept 2026 View ↗ PDF 2400 series Proposed reflected ceiling plans Drawing · 14 Sept 2026 View ↗ PDF 3000 series Entry threshold, windows, gutter valley and lead detailsdetails Drawing · 14 Sept 2026 View ↗ PDF August 2026 Construction management plan Document · 1 Sept 2026 View ↗ PDF 4003 rev 00 Cullum welch court roof plans existing & proposed Drawing · 1 Sept 2026 View ↗ PDF 4002 rev 00 Detail plan bicycle enclosure Drawing · 1 Sept 2026 View ↗ PDF 4000 rev 00 Location plan Drawing · 1 Sept 2026 View ↗ PDF 3001 rev 00 Landscaping details plans existing, dismantling & proposed Drawing · 1 Sept 2026 View ↗ PDF 4001 rev 01 Site plan Drawing · 1 Sept 2026 View ↗

Other documents 21

PDF Correspondance Correspondence · 15 Sept 2026 View ↗ PDF 6000 Accommodation schedule Document · 14 Sept 2026 View ↗ PDF Landscape strategy report (appendix 1) Document · 14 Sept 2026 View ↗ PDF Landscape strategy report (appendix 2) Document · 14 Sept 2026 View ↗ PDF Landscape strategy report (appendix 3) Document · 14 Sept 2026 View ↗ PDF Landscape strategy report (appendix 4) Document · 14 Sept 2026 View ↗ PDF Hudu healthy urban planning checklist Document · 1 Sept 2026 View ↗ PDF Landscape strategy report Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix a Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix b (part 2) Document · 1 Sept 2026 View ↗ PDF Rev 008 Schedule of works Document · 1 Sept 2026 View ↗ PDF Structural engineering report Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix c (part 2) Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix e Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix b (part 1) Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix c (part 1) Document · 1 Sept 2026 View ↗ PDF Structural engineering report - appendix d Document · 1 Sept 2026 View ↗ PDF 6100 Door schedule Document · 1 Sept 2026 View ↗ PDF Rev 001 Scope photographs Document · 1 Sept 2026 View ↗ PDF 6200 Window schedule Document · 1 Sept 2026 View ↗ PDF 14/08/2026 Area schedule Document · 1 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 7

Grade II listed: Lamp Standard in Centre of Quadrangle of Morden College
List entry 1211742 · 18 m away · 2 more listed buildings within 150 m (1 Grade I, 1 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
COA00000762 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Air quality management area: Greenwich AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Greenwich built-up area; Metropolitan Open Land 10 m away; Priority habitat 22 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 18 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Greenwich - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Greenwich
Application type
Listed Building Consent
Postcode
SE3 0PW
Received
28 Aug 2026
Validated
11 Sept 2026
Ward
BLACKHEATH WESTCOMBE
Case officer
Show
Agent
Newmark

Decision outlook

Day 24 of the 56-day target. Greenwich usually decides listed building works by day 56.

Day 2432 days to the 56-day target
58%decided within 8 weeks
86%approved
57decided in the last year

Plota live figures for listed building works decided by Greenwich in the last twelve months, from validation. Greenwich decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14903013
Consultation
24 Sept 2026
Comments by
14 Oct 2026
Env. assessment
No
Greenwich
Planning Authority Score
5.4/10
Average
#123 of 296 councils
Relevant to this application:
Other decisions

Greenwich is faster than most councils at deciding householder applications, ranking #76 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Greenwich is also one of the strictest councils - it refuses more householder applications than almost any other, with only 78% approved vs 90% nationally.

One of the strictest councils
only 78% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Greenwich decision statistics
Based on MHCLG data, the year to March 2026
77%
Overall approval rate
Below avg (87%) #278 of 296
78%
Householder approved
Below avg (90%) #287 of 296
75%
Decided in 8 weeks
Above avg (63%) #76 of 296
29%
Extended time limit
Below avg (41%) #49 of 296
60%
Minor dwellings approved
114 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
66%
Change of use approved
195 decided
1,468
Total decisions
331 refused in the year to March 2026