West Burton Solar Project, Common Lane, Sturton le Steeple, DN22 9BL Data via plota.co.uk

DCO/4873 Pending

Proposal

The West Burton Solar Project Order 2025 Development Conset Order. Discharge of the following requirements :12, 19, 13, 15 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Sept 2026
✓
Validated
11 Nov 2026
Decision
Expected by 6 Jan 2027

Under consideration

No decision has been issued yet. A decision is expected by 6 Jan 2027.

Site constraints 4

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 802 m away: West Burton Solar Project
The site is about 802 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Steeple Renewables Project (awaiting the Secretary of State's decision, about 809 m); West Burton C power station (decided, about 1.2 km); STEP Fusion (at pre-application, about 669 m); North Humber to High Marnham (at pre-application, about 852 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Public footpath about 27 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Nottinghamshire County Council - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
DN22 9BL
Received
8 Sept 2026
Validated
11 Nov 2026
Case officer
Show