South Dock Marina St Georges Wharf Rope Street London Southwark SE16 Data via plota.co.uk

26/AP/2738 - Approval of Details Under consideration/assessment

Proposal

Details of Condition 14 (details of Bee bricks and/or invertebrate hotels) as required by full planning permission ref: dated 20/11/2025 for: (refurbishment of South Dock Marina boatyard to include demolition and removal of all buildings and structures on site, renew services infrastructure, new electricity substation, underground drainage, and hard standings and provide new workshops, studios, toilets showers laundry and associated landscape. Construct new covered boat repair areas with associated gantry and staircase. Removal of the existing crane and replace with new crane, pontoon adjacent to the crane and associated public realm works to the crane area. Addition of new trees to the river walk). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
16 Sept 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 10 Nov 2026.

Site constraints 13

4 listed buildings within 150 m
Nearest: Parish Boundary Stone, 24 m away · 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 648 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Thames Path 5 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Archaeological priority area: North Southwark and Roman Roads
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Southwark AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Radon affected area, class 2; Flood defence 5 m away (wall, designed for a 1 in 1000 year flood); Priority habitat 5 m away: Mudflats; Inside the Lewisham built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square; Designated open space 5 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Southwark - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Southwark
Application type
Approval of Details
Received
15 Sept 2026
Validated
16 Sept 2026
Ward
Surrey Docks
Parish
Bermondsey And Rotherhithe
Case officer
Show
Target decision
10 Nov 2026
Applicant
Show
Agent
Cottrell and Vermeulen Architecture

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
10 Nov 2026
Env. assessment
No
Southwark
Planning Authority Score
7/10
Good
#64 of 296 councils
Relevant to this application:
Householder decisions

Southwark is faster than most councils at deciding householder applications, ranking #54 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Southwark decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #93 of 296
95%
Householder approved
Above avg (90%) #92 of 296
78%
Decided in 8 weeks
Above avg (63%) #54 of 296
37%
Extended time limit
Below avg (41%) #122 of 296
92%
Minor dwellings approved
259 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
82%
Change of use approved
38 decided
1,622
Total decisions
132 refused in the year to March 2026